Home > Manufacturing & Processing Machinery > Mining Machinery > Other Mining Machinery > Complete Equipment List Provided Gold CIL Turnkey Processing Line

Complete Equipment List Provided Gold CIL Turnkey Processing Line

Complete Equipment List Provided Gold CIL Turnkey Processing Line photo-1
Complete Equipment List Provided Gold CIL Turnkey Processing Line photo-2
Complete Equipment List Provided Gold CIL Turnkey Processing Line photo-3
Complete Equipment List Provided Gold CIL Turnkey Processing Line photo-4
Complete Equipment List Provided Gold CIL Turnkey Processing Line photo-5

Product Spotlights

1. 90%-95% high gold recovery rate.
2. Universal CIL line for all gold ores.
3. Flexible capacity: 20–5000 TPD.
4. Low power & reagent cost, high efficiency.
5. Anti-corrosion structure for longer service life.
6. Carbon recycling cuts operational consumption.
7. Intelligent control, easy & labor-saving operation.
8. Combined process enables stable 24h running.
9. Globally proven & mine-adaptable CIL technology.
10. Full one-stop turnkey mining solution.
Negotiable MOQ: 1 Combo (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Warranty:
1 year
After-sales Service:
24/7 technical support
Transport Package:
new
Payment & Shipping
Payment Methods:
Port of Shipment:
Qingdao Tianjing Shanghai
Delivery Detail:
30 days
Warranty 1 year
After-sales Service 24/7 technical support
Transport Package new
Specification Standard
Trademark Staurk
Origin China

1. Product Description

This gold CIL turnkey processing line is a full‑set packaged solution with standardized complete equipment list delivered to customers. It covers every single piece of machinery required for gold cyanidation carbon‑in‑leach production, avoiding missing components and mismatched auxiliary equipment. Available capacity ranges from 50TPD to 12000TPD, applicable for hard‑rock gold ore, oxide gold ore, low‑sulfide gold ore and gold‑bearing tailings recovery projects.The detailed equipment list includes crushing unit, grinding unit, thickener, series leaching tanks, carbon interception screens, desorption‑electrolysis system, carbon regeneration furnace, automatic chemical dosing system, tailings detoxification equipment, wastewater recycling system, PLC control cabinet and all pipes, valves, motors, spare‑part kits. Each item with model, quantity, specification and technical parameters is supplied together with the goods.Mainly exported to Ecuador, South America, Africa and Central Asia. Customers can clearly check all delivered machines in advance, convenient for budget evaluation, site infrastructure planning and acceptance inspection after goods arrival.

2. Working Principle

It adopts mature CIL leaching‑adsorption metallurgical process, meanwhile follows standardized turnkey project execution with full equipment list management:

  1. List Confirmation: Confirm full equipment bill of materials according to ore property, processing capacity and site conditions before production, every main unit and auxiliary accessory is listed clearly.

  2. Manufacturing & Inspection: All equipment is manufactured, tested and grouped strictly against the confirmed list; goods are marked corresponding to list items before container loading.

  3. On‑site Installation: Following the equipment list, operators complete installation, pipeline connection and wiring for each device one‑by‑one.

  4. CIL Metallurgical Process: Crushed‑ground ore forms qualified pulp; gold dissolves into gold‑cyanide complex ions under cyanidation condition; activated carbon adsorbs dissolved gold ions in leaching tanks; loaded carbon is separated for desorption‑electrolysis to produce gold mud for smelting; barren carbon is regenerated for recycling; tailings and wastewater receive harmless treatment.

  5. Acceptance Check: End‑user checks received goods against the complete equipment list, then carries out commissioning, trial production and final project handover.

3. Core Features

  1. Transparent full‑set equipment list: Every device, accessory and wearing part is clearly itemized with model and quantity, no hidden missing parts.

  2. Convenient budget & infrastructure planning: Clients can estimate investment and design foundation drawing according to provided equipment list in early stage.

  3. Easy cargo acceptance: Quick checking after container arrival, effectively prevent shortage and wrong delivery.

  4. Perfect matching among units: Main equipment and auxiliary accessories are uniformly configured, avoiding compatibility problems caused by scattered separate purchasing.

  5. Wide capacity range: Supports small modular lines as well as large‑scale industrial turnkey plants.

  6. Clear spare‑part reference: The list marks wearing parts, offering convenient reference for later‑period procurement of replacements.

  7. Suitable for overseas mining projects: Well‑adapted to Ecuador, Latin‑American and African mine requirements, convenient for customs clearance and project audit.

  8. Complete turn‑key service: Equipped with process design, installation guidance, commissioning and operator training besides hardware supply.

Product Tags: Gold CIL processing plant , Gold CIL plant for sale , Complete gold CIL production line

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Gold Verified Supplier
1Yr
Verified Business License
Business Type
Manufacturer
Year Established
2008
Factory Size
5,000-10,000 square meters
Annual Export Value
US$2.5 Million - US$5 Million