How Much is the Urban Sewage Treatment Equipment? for Cost-effective Sewage Treatment Equipment, Choose Zerui Environmental Protection
How much does the urban sewage treatment equipment cost? If you are looking for cost - effective sewage treatment equipment, choose Shandong Zetray Environmental Protection Technology Co., Ltd.
Reference price of integrated sewage treatment equipment:
The price of the buried integrated sewage treatment equipment for treating 0.5 tons of sewage per day is 15000 yuan.
The price of the buried integrated sewage treatment equipment for treating 1 ton of sewage per day is 23000 yuan.
The price of the buried integrated sewage treatment equipment for treating 2 tons of sewage per day is 26500 yuan.
The price of the buried integrated sewage treatment equipment for treating 3 tons of sewage per day is 30000 yuan.
The price of the buried integrated sewage treatment equipment for treating 5 tons of sewage per day is 35000 yuan
Warranty of integrated sewage treatment equipment: All equipment and components provided by us are subject to strict quality control. We strictly control the procurement channels to fully meet the technical requirements stipulated in the contract. All equipment comes with a one - year warranty and we are responsible for lifetime maintenance.
After - sales service:
If the equipment malfunctions or has other technical problems after the project acceptance, our technical staff will ensure to rush to the site in time to troubleshoot and ensure the normal operation of the facilities. If there are problems with the spare parts, we guarantee to supply and replace them in time. According to your actual usage, our professional technicians will guide you in installation and commissioning to ensure the safe and reliable use of our company's products. To help you master more scientific product usage methods, we will provide timely personnel guidance services. We follow relevant national and industry regulations to implement the "Three Guarantees" and lifetime service.
Shandong Zetray Environmental Protection Technology Co., Ltd. will continue to work hard and provide high - quality products and perfect services to users, and be your sincere friend!
Working principle of integrated sewage treatment equipment:
The buried integrated sewage treatment equipment is a cuboid - shaped modular sewage biological treatment equipment, which adopts the principles of anaerobic, aerobic and microbial decomposition. For those who have kept fish, we can simply understand it as the biochemical bacteria house in the fish tank filter. The front filter cotton is for physical filtration, and the biochemical bacteria house at the back decomposes the organic matter contained in fish feces and leftover food. It can be both mysterious and simple. It just has an additional anaerobic - aerobic treatment process compared with the fish tank filtration system.
Operation procedure of integrated sewage treatment equipment
1. Open the inlet valve and outlet valve, start the equipment's influent lift pump to convey the sewage from the regulating tank to the buried domestic sewage treatment equipment;
2. During the first use and commissioning, stop the influent pump when the water level reaches 1/2 of the equipment's height. Open the air inlet valve of the fan, start the fan, and slowly open the air outlet valve of the fan. Aerate the contact oxidation tank for 48 hours, then start the influent lift pump to add sewage to 3/4 of the equipment, and then aerate the tank for 24 hours;
3. Touch the filler by hand to see if it has a sticky feeling, and observe the growth of microorganisms in the water. Continuously convey sewage to the equipment until a layer of orange - yellow biofilm grows on the filler. The water volume should be gradually increased to the designed water volume;
4. Regularly observe the growth of microorganisms in the water. If any abnormality is found, promptly control the influent water volume for adjustment;
5. Observe the flow pattern of the secondary sedimentation tank. The water collection at the outlet weir must be uniform. Generally, the sludge should be discharged once every 24 hours. When discharging sludge, open the sludge discharge solenoid valve and use the air - lift method to lift the sludge in the secondary sedimentation tank to the sludge tank;
6. Add disinfectants (such as chlorine tablets) to the disinfection tank as needed. The water from the secondary sedimentation tank passes through the disinfectant dosing basket, and part of the disinfectant dissolves to achieve the purpose of disinfection. After the treated water stays in the clean water tank for about 0.5 hours, it meets the discharge requirements and can be discharged to the external receiving water body;
7. After the equipment commissioning is completed and it runs normally, the system can enter the automatic operation mode. Switch the operation of the water pump and the fan to the automatic operation state on - site. Since the electrical operation control cabinet uses the PLC automatic control program, the program has been programmed before the equipment leaves the factory (usually switch once per shift), and no additional settings are required during operation;
8. The effluent water quality should be tested irregularly according to the environmental protection discharge requirements to ensure the normal operation of the equipment.
Buried sewage treatment equipment_Integrated buried sewage treatment equipment_Shandong Zetray Manufacturer
How much does the urban sewage treatment equipment cost? If you are looking for cost - effective sewage treatment equipment, choose Shandong Zetray Environmental Protection Technology Co., Ltd.
Send Inquiry to This Supplier
You May Also Like
-
High-efficiency Inclined Tube Sedimentation Tank With 50% Less Floor Space, Using 60° Honeycomb Inclined Tubes to Triple the Solid-liquid Separation EfficiencyUS$ 1535.38 - 4584.62MOQ: 1 Unit
-
What Equipment is Used for Sewage Treatment in Nursing Homes? Zerui Environmental Protection Will Tell You.US$ 2430.77 - 3538.46MOQ: 1 Unit
-
Integrated Sewage Treatment Equipment for Laundry Factories, Custom-made, With Up-to-standard EffluentUS$ 1705.85 - 2430.77MOQ: 1 Unit
-
Which Company Offers the Best Small Integrated Sewage Treatment Equipment? Choose Zerui Environmental Protection for Peace of Mind.US$ 3169.23 - 4307.69MOQ: 1 Unit
-
How Much is the 10-ton Integrated Sewage Treatment Equipment? Zherui Provides the Price of 10-ton Sewage Treatment Equipment Online.US$ 1676.92 - 2600MOQ: 1 Unit
-
How Much is the Hospital Sewage Treatment Equipment? the Sewage Treatment Equipment is Provided Online by Zherui Environmental Protection, a Manufacturer.US$ 2430.77 - 3538.46MOQ: 1 Unit
-
Manufacturer and Price of Sewage Treatment Equipment for Pig Farms - Trust and Consult Shandong Zerui Environmental ProtectionUS$ 2892.31 - 3661.54MOQ: 1 Unit
-
Factory Direct Sale: Sludge Dewatering Machine for Paper Mills With Cake Moisture Content as Low as 60%US$ 3215.38 - 3661.54MOQ: 1 Unit
-
Automatic Sludge Dewatering Machine Low Energy Consumption for Municipal & Industrial Wastewater TreatmentUS$ 2123.08 - 2307.69MOQ: 1 Unit
-
Zerui Customized Mbr Integrated Sewage Treatment Equipment With Low Price and High-quality ServiceUS$ 753.85 - 11538.46MOQ: 1 Unit