ZDY-1900S Double Pump Full Hydraulic Tunnel Drill for Coal Mine
The brief introduction of ZDY-1900S double pump full hydraulic tunnel drilling rig for coal mines
ZDY1900S full hydraulic tunnel drilling rig is mainly used for gas drainage, trenchless street crossing, anchor support holes and other construction operations. ZDY1900S full hydraulic drilling rig uses all hydraulic power head type structure, composed of main engine, pumping station, operating station. It has good disintegration, convenient demolition and flexible arrangement. The gyrator is through hole structure. The length of drill pipe is not restricted by the structure size of the drilling rig;When the machine screw and unscrew drill tools, chuck, clamp and oil cylinder, gyrator and gripper can operate in linkage. with high automation and high efficiency, the operation is simple and the labor intensity of the workers is small.
2.The technical parameter of ZDY-1900S double pump full hydraulic tunnel drilling rig
Project |
Unit |
Parameter |
Maximum drilling depth |
m |
350/100 |
Drilling diameter |
mm |
113/128 |
Diameter of the end hole |
mm |
150/200 |
Drill pipe diameter |
mm |
63.5/73 |
Borehole dip angle |
° |
0-±90 |
Output torque |
n.m |
500-1600 |
Normal propulsion speed |
m/s |
0-0.22 |
The applicability of the strength coefficient of coal and rock |
f≦10 |
|
Mainframe size |
mm |
2300*1100*1560 |
The weight of the whole machine (excluding the drill pipe) |
kg |
2040 |
Host weight |
kg |
|
Motor power |
kw |
37 |
Shandong Master Machinery Group Co.,Ltd.
Sales manager:jennifer
Mobile phone:86-15092662911
WeChat: 15092662911
QQ:2864425736
Service hotline:400-167-0537
TEL:86-0537-3860909
Website:
ZDY-3200S double pump full hydraulic tunnel drill for coal mine
Key words: mine drilling rig, full hydraulic, mineral equipment, double pump
1. The brief introduction of ZDY-3200S double pump full hydraulic tunnel drilling rig for coal mines
The full hydraulic tunnel drilling rig ZDY3200S for coal mine is mainly used for drilling holes of large diameter gas (row), grouting and fire prevention holes, coal seam flooding holes, anti outburst and pressure relief holes, water penetration holes, geological exploration holes and other engineering drilling holes. It is suitable for rock strength coefficient of F below 10 kinds of coal and rock drilling. Appropriate drill bits and drill pipes can be used for coring, soft coal seam drilling and other engineering operations.
2.The main characteristics of ZDY-3200S double pump full hydraulic tunnel
drilling rig
a.The ZDY3200S full hydraulic tunnel drilling rig is a combined structure of all hydraulic power head. It consists of four parts: the hydraulic pump station, the power head, the rack, the operation floor and the column support.
b.The breakage performance is good, the components are light in weight, easy for underground driller to move and shift, and drill field layout is flexible.
c.Unique hydraulic system, double pump. The rotary parameters of drilling rigs and the feeding parameters can be independently regulated, which improves the adaptability of drilling rig to various drilling processes.
d.The power head gyrator adopts the structure of double motor and transmission spindle through hole, and the length of drill pipe is not restricted by the drilling machine, that is to choose the drill pipe with different length according to the construction conditions of the underground drilling field.
e.The hydraulic chuck and the hydraulic gripper are used for unloading the drill pipe, which is simple, labor-saving, efficient and safe.
f.The oil pipe connection is between the operation platform, the pump station and the main engine, so you can operate it intensively and the personnel can operate far away from the wellhead to protect personal safety.
g.Four column support, lifting cylinder adjusting the fuselage (drilling inclination angle), convenient and labor-saving.
h.With variable pump, it can stepless speed regulation and adapt to large working conditions.
3.The technical parameter of ZDY-3200S double pump full hydraulic tunnel drilling rig
Project |
Unit |
Parameter |
Maximum drilling depth |
m |
350/100 |
Drilling diameter |
mm |
150/200 |
Drill pipe diameter |
mm |
63.5/73 |
Borehole dip angle |
° |
0-±90 |
Output torque |
n.m |
500-1600 |
Ability to feed |
kn |
102 |
Pullout ability |
kn |
70 |
Gyration speed |
r/min |
50-175 |
Normal propulsion speed |
m/s |
0-0.22 |
The applicability of the strength coefficient of coal and rock |
f≦10 |
|
Mainframe size |
mm |
2300*1100*1560 |
The weight of the whole machine (excluding the drill rod) |
kg |
2100 |
Host weight |
kg |
1180 |
Motor power |
kw |
37 |
Master Machinery Group Co.,Ltd. China
Sales Manager: Dong Li
Sales hotline:86 537 18865479507
Tel: 18865479507
wahtsapp: 8618865479507
Website:
Send Inquiry to This Supplier
You May Also Like
-
2000m Depth Geology Exploration Rig XY-8 Deep Hole Water Well Drilling Machine/ Diamond Drill MachineUS$ 3000 - 3500MOQ: 1 Set
-
1000m XY-44A Borehole Water Drilling Rig Machine on SaleUS$ 2500 - 2800MOQ: 1 Set
-
China Best Crawler KY-150 Hydraulic Reverse Circulation(RC) Drilling Rig for Mining ProspectionUS$ 3800 - 4000MOQ: 1 Set
-
KY-200 Mine Rock Drilling Machine Hydraulic Metal Drilling Machine on SaleUS$ 3800 - 4000MOQ: 1 Set
-
KY-250 Hydraulic Exploration Drilling Rig for Metal Mine /gold Ore Exploration Rig /high Efficiency Prospecting Drilling RigUS$ 3800 - 4000MOQ: 1 Set
-
Rope Coring Drill in Tunnel KY-300 / Full Hydraulic Drilling RigUS$ 3800 - 4000MOQ: 1 Set
-
Full Hydraulic Core Drilling Rig / Tunnel Rig on SaleUS$ 3800 - 4000MOQ: 1 Set
-
220m Depth Core Drilling Rig / Metal Mining Rig Made in ChinaUS$ 3800 - 4000MOQ: 1 Set
-
Mine Drill Equipment / Exploration Core Drilling on SaleUS$ 3800 - 4000MOQ: 1 Set
-
Metal Mine Exploitation Drilling Rig / Multi-angle Construction in the TunnelUS$ 3800 - 4000MOQ: 1 Set