Home > Manufacturing & Processing Machinery > Mining Machinery > Mining Mill > Coal Injection Machine of Coal Pulverizer

Coal Injection Machine of Coal Pulverizer

Coal Injection Machine of Coal Pulverizer photo-1
Coal Injection Machine of Coal Pulverizer photo-2
Coal Injection Machine of Coal Pulverizer photo-3
Coal Injection Machine of Coal Pulverizer photo-4
Coal Injection Machine of Coal Pulverizer photo-5
Coal Injection Machine of Coal Pulverizer photo-6
US$ 2,000 - 3,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Condition:
New
Type:
Other, spraying coal machine
Motor Type:
AC Motor
Payment & Shipping
Payment Methods:
Port of Shipment:
Qingdao Tianjin Shanghai Lianyungang
Delivery Detail:
Delivery time depends on order quantity.
Condition New
Type Other, spraying coal machine
Motor Type AC Motor
Power(W) 15-18.5kw-4
Capacity(t/h) 600kg/h
Place of Origin Henan, China
Brand Name Derui
Model Number MP500
Dimension(L*W*H) 1.5*1.1*0.8m
Weight 1.3t
Certification ISO
Warranty one year
After-sales Service Provided Engineers available to service machinery overseas

Coal injection machine of coal pulverizer

 

 

 

Coal pulverizer is widely used for industrial boiler (such as heating, annealing, tempering), heating boiler, conduction oil boiler (drying, vaporing) and other kinds boilers. It can be used instead of fuel oil, gas, and electrical heat energy equipment, which can save 50% energy.

Coal injection machine of coal pulverizerCoal injection machine of coal pulverizer

Coal injection machine of coal pulverizerCoal injection machine of coal pulverizer

Coal pulverizer characteristics:

 

Thick lining panel: coal pulverizer, the inner shell lining is with thick chrome steel plates. So it is very durable.

 

High wear-resistant hammer for crushing.

 

Small particle size: after crushed,the particle size is smaller, when burning it will be more sufficiently and more environmental(less smoke). The particle size is about 160-200 mesh.

 

High production capacity. coal pulverizer is with reasonable design, 10% higher than similar products in production.

 

Combustion. Our machine has double oxygen input, it can improve efficiency and burn sufficiently.

 

Rapid deceleration integration: reduction gear and spindle are designed in same group, to save electricity.

 

No black smoke.

Coal injection machine of coal pulverizer

 

Coal pulverizer structure and working principle:
Coal pulverizer is consist of feeder, grinding chamber, fan chamber and separator.
Grinding chamber is consist of crushing body, main shaft, coal hammer and lining board.
Fan chamber, installed fixed fan on shaft, spraying coal powder to burner.


At the bottom of separator, connect with machine body, at the top, coal powder conveyor connect with pipe, In the cutting edge of separator welded with big size coal powder backflow pipe connect with material entrance, big size coal back to grinding chamber for grinding again.

Coal injection machine of coal pulverizer

Coal pulverizer technical parameter:

 

Model Output Spout Pressure Air volume Coal powder size Revolution Motor
(kg/h) (mm) (m3/h) (mm) (kw)
MP-300 350 150 1800 0.05 2200 11kw-4stages
MP-500 600 150 2000 0.05 2400 15kw-4stages
MP-600 700 150 2500 0.05 2400 18.5kw-4stages
MP-1000 1000 150 3000 0.05 2400 22kw-4stages

 

 

Coal pulverizer Application:

Coal pulverizer to be used for drying, annealing, tempering boilers, steam and so on. 

Applicable industry: Malleable Iron, foundries, rolling mills, strip mills, cement plants, boiler plant industry.

It can replace oil, gas and electric power thermal energy equipment, which can save 40-50% of energy.

Coal injection machine of coal pulverizer

Mark of coal: bituminous coal;
Gross calorific value: ≥5000kcal/kg (≥ 20000kJ/kg);
Net calorific value: ≥4200kcal/kg;
Volatile matter: ≥25%;
Ash Content: ≤10%;
Total moisture: ≤35%;
Inherent moisture: ≤14%;
Total sulphur: ≤1%;
Particle size: ≤20mm.
Note: These indexes are the lowest requirements for the coal, the better coal will be

better at practice.

 

Coal pulverizer shipping:

Coal injection machine of coal pulverizer

 

Derui services:

 

 

Payment: By TT,30% upon order confirmed, 70% upon shipment.

 

 

Delivery: After we got your prepayment, we can arrange the production, it need take 6(six) working days.Second, it will need 4(four) 

days for the inland transportation to china Port. third, it will need 2(two) days for complete the china customs clearance.


Warranty: one year. If any parts (excluding easily damaging parts) are found defective in quality in the first year, we shall replace it 

free-of-cost. But the relevant cost shall be bear in your account (round trip air ticket, board and lodging).

 

Coal injection machine of coal pulverizer

How to visit us ?

 

If you want to visit our factory, please note our city name, Zhengzhou City, Henan Province, China(mainland)

 

Our air port name is : Zhengzhou Xinzheng International air port.

 

Train station name is: Zhengzhou (Zhengzhou north) train station

 

 

 

 

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2004
Factory Size
1,000-3,000 square meters
Total Employees
51 - 100 People