Home > Industrial Equipment & Components > Environment Protection Device > Waste Treatment Equipment > Designed for Coking and Fertilizer Plants: High Ammonia Nitrogen Wastewater Treatment System

Designed for Coking and Fertilizer Plants: High Ammonia Nitrogen Wastewater Treatment System

Designed for Coking and Fertilizer Plants: High Ammonia Nitrogen Wastewater Treatment System photo-1
Designed for Coking and Fertilizer Plants: High Ammonia Nitrogen Wastewater Treatment System photo-2
Designed for Coking and Fertilizer Plants: High Ammonia Nitrogen Wastewater Treatment System photo-3
Designed for Coking and Fertilizer Plants: High Ammonia Nitrogen Wastewater Treatment System photo-4
Designed for Coking and Fertilizer Plants: High Ammonia Nitrogen Wastewater Treatment System photo-5

Product Spotlights

Specialized system for coking & fertilizer wastewater with ≥95% ammonia nitrogen removal. Features anti-shock loading, PLC automation, low energy consumption, and optional resource recovery. Backed by ISO-certified manufacturer with global project experience and on-site support.
US$ 5280 - 585000 MOQ: 1 Combo
Key Specifications
Get Latest Price
Warranty:
1 year (extendable)
Treatment Capacity:
Customizable (from 10 m³/h to 500 m³/h)
Process Type:
Biological + Physicochemical Combined Process
Payment & Shipping
Payment Methods:
Port of Shipment:
Qingdao
Delivery Detail:
20 days
Warranty 1 year (extendable)
Treatment Capacity Customizable (from 10 m³/h to 500 m³/h)
Process Type Biological + Physicochemical Combined Process
Removal Efficiency Ammonia nitrogen removal ≥95%
Material Carbon steel / Stainless steel (optional)
Control System PLC automatic control (HMI touch screen)
Application Industry Coking plants, fertilizer plants, chemical plants
Power Supply 380V / 220V / Custom voltage
Installation Type Skid-mounted or containerized (optional)
Certifications ISO9001, ISO14001 (company level)

Trusted Partner for Industrial Wastewater Treatment
As a leading manufacturer based in Qingdao, China, Qingdao Conqinphi Environmental Technology Group Co., Ltd. has been dedicated to providing advanced environmental solutions since 2015. Our High Ammonia Nitrogen Wastewater Treatment System is specifically engineered for the demanding conditions of coking and fertilizer plants. With a factory spanning 10,000–30,000 square meters and a team of 201–300 skilled professionals, we combine innovation with robust manufacturing to deliver reliable, cost-effective systems. This product addresses the critical challenge of treating wastewater with high ammonia nitrogen content, ensuring compliance with stringent environmental standards while recovering valuable resources. Backed by our annual export value of US$10–50 million, we have supplied solutions to markets across North America, Europe, Asia, Africa, and beyond.

Key Features & Technical Specifications

Our system integrates multiple stages to achieve high removal efficiency and stable operation. Below are the core features and performance parameters:

Parameter Value / Description
Inlet Ammonia Nitrogen Concentration 100 – 5,000 mg/L
Outlet Ammonia Nitrogen Concentration ≤ 15 mg/L (adjustable to local standards)
COD Removal Rate ≥ 90%
Operating Temperature 15–40°C (optimal)
Process Stages Pretreatment → A/O Biological Treatment → Sedimentation → Advanced Oxidation (optional)
Energy Consumption Low: 0.5–1.2 kWh per m³ treated water
Sludge Production Minimized by optimized biological process

Detailed Advantage Analysis

  • High-efficiency biological removal: Uses specialized microorganisms that thrive in high-ammonia environments, achieving >95% removal without chemical overdose.
  • Robust anti-shock loading: The system can handle sudden spikes in ammonia concentration, common in coking and fertilizer manufacturing, without performance failure.
  • Flexible customization: Available in skid-mounted or containerized designs for easy installation and relocation. Capacities from 10 m³/h to 500 m³/h can be tailored to your site.
  • Automation & remote monitoring: Equipped with PLC and touch screen interface, allowing operators to monitor real-time data and adjust parameters remotely. This reduces labor costs and human error.
  • Resource recovery potential: Optionally integrate ammonia stripping or struvite precipitation to recover ammonium sulfate as fertilizer byproduct, turning waste into value.
  • Low operating costs: Energy-efficient aeration and reduced chemical consumption compared to conventional physico-chemical methods. Typical payback period is under 2 years for medium-sized plants.
  • Compliance with international standards: Designed to meet discharge limits of EU, US EPA, and local regulations. Our company holds ISO9001, ISO14001, and other management certifications, ensuring consistent quality.

Why Choose Conqinphi?

Since 2015, we have delivered over 200 wastewater treatment projects worldwide, serving industries from coking to fertilizer production. Our factory in Qingdao operates with advanced manufacturing equipment, which allows us to control quality from raw material to final assembly. With annual export value exceeding US$10 million, we have earned trust from clients in more than 30 countries. Our team of 201–300 employees includes experienced R&D engineers and after-sales technicians who provide on-site installation guidance and 24/7 remote support. We offer a 1-year warranty (extendable) and comprehensive spare parts supply. Contact us today to receive a detailed proposal and quotation tailored to your specific wastewater characteristics.

Frequently Asked Questions (FAQ)

  1. Q: What is the typical payback period for this system?
    A: Depending on the scale, water quality, and local regulations, most clients achieve payback within 1.5–3 years through reduced effluent fines, water reuse, and possible resource recovery.
  2. Q: Can this system handle coking plant wastewater with high phenol content?
    A: Yes, our pretreatment stage includes phenol extraction or chemical oxidation to protect the biological stage. We customize the process based on your full water analysis.
  3. Q: What are the maintenance requirements?
    A: The system is designed for low maintenance. Daily checks include DO sensors and sludge level. Quarterly, membranes (if any) or diffusers need cleaning. Our service team provides training and remote support.
  4. Q: Do you provide on-site commissioning?
    A: Yes, we offer optional on-site commissioning and training for your operators. Travel expenses are quoted separately.
  5. Q: How long does installation take?
    A: For skid-mounted units, installation can be completed in 2–4 weeks. Containerized systems require 1–2 weeks of site preparation. Full timeline is provided in the project plan.
  6. Q: What is the warranty policy?
    A: Standard warranty is 12 months from commissioning. We also offer extended warranties up to 3 years at additional cost. Spare parts are available for quick replacement.
  7. Q: Can the system be upgraded later for stricter discharge limits?
    A: Absolutely. The modular design allows adding advanced treatment units (e.g., Fenton oxidation, membrane filtration) without replacing the entire system.
  8. Q: Do you have references from fertilizer plants?
    A: Yes, we have successfully delivered projects to fertilizer plants in Southeast Asia and South America. We can share case studies under NDA.
Product Tags: High Ammonia Nitrogen Wastewater Treatment System , Coking Plant Wastewater Treatment Equipment , Fertilizer Industry Effluent Treatment Solution

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Gold Verified Supplier
1Yr
Verified Business License
Business Type
Manufacturer
Year Established
2015
Factory Size
10,000-30,000 square meters
Annual Export Value
US$10 Million - US$50 Million

Recommended Categories

Explore top categories and find suppliers for your specific needs