Frp Fiberglass Reinforced Plastic Waste Gas Scrubber, Acid-base Gas Absorption Tower, Process Waste Gas Treatment Equipment
FRP Fiberglass Reinforced Plastic (FRP) Waste Gas Scrubber, Acid-Base Gas Absorption Tower, Process Waste Gas Treatment Equipment
Note: The selling price is a reference price. It fluctuates with raw materials and specifications. We support custom processing. Please contact us for detailed discussions on the specific price and technical parameters. The contract shall prevail!

Installation, Maintenance and Upkeep of Fiberglass Waste Gas Scrubber
1. Users should carry out the concrete foundation construction according to the foundation material drawing provided by our company. The installation surface of the foundation should be guaranteed to be on the same horizontal plane. The feet of the fiberglass absorption tower should be fixed on the foundation steel plate with anchor bolts or lap joints.
2. When installing the fan, be careful to prevent sundries from falling into the fan. After the installation of the fiberglass absorption tower is completed, the dirt inside the tower must be removed before the test run.
3. If the fan is installed indoors, the motor of the fan must be protected from rain.
4. The fiberglass absorption tower of the waste gas scrubber must be managed by a dedicated person. Regularly check whether the fan is operating normally, whether the liquid level is normal, whether the float switch in the liquid level tank is normal, whether the solution concentration is within the specified range, etc. If any problems are found, they should be dealt with in a timely manner.
5. To ensure the liquid level in the liquid storage tank and prevent the liquid level from rising and falling when the fan is switched on and off, the float water supply valve must be opened after the fan is started, and the float water supply valve must be closed before the fan is shut down.
6. The metal support of the fiberglass absorption tower should be anti-corrosive treated at least twice a year.










Send Inquiry to This Supplier
You May Also Like
-
Yike 50-cubic-meter Fiberglass Reinforced Plastic (frp) Hydrochloric Acid Storage Tank, Vinyl Resin Wound Frp ContainerUS$ 7230.77 - 7846.15MOQ: 1 Cubic Meter
-
[buy! Buy! Buy!] Nanjing Desulfurization Tower Spray Layer - Model, Maintenance, CustomizationUS$ 1336.31 - 1362.46MOQ: 1 Unit
-
Fiberglass Reinforced Plastic (frp) Tail Gas Absorption Tower - Frp Tail Gas Absorption Tower - Parameters of Fiberglass Reinforced Plastic Tail Gas Absorption TowerUS$ 2907.38 - 3056.62MOQ: 1 Unit
-
Packed Frp Tail Gas Absorption Tower, Waste Gas Absorption Tower, Complete Acid Mist Purification EquipmentUS$ 7952.15 - 7979.38MOQ: 1 Unit
-
Frp Hydrochloric Acid Absorption Tower, Frp Energy-saving Washing Tower, Yike Brand Acid Mist PurifierUS$ 3000 - 3046.15MOQ: 1 Unit
-
Yike Frp Acid Mist Purification Tower, Acid-base Exhaust Gas Absorption Tower, Workshop Tail Gas Scrubber, Purification RateUS$ 1964 - 1982.77MOQ: 1 Unit
-
Specifications and Parameters of High-temperature Resistant Fiberglass Reinforced Plastic Waste Gas Absorption Tower and Acid-base Gas Purification TowerUS$ 6000 - 6153.85MOQ: 1 Unit
-
Silicon Carbide Wear-resistant Frp Spray Pipe, Oxidation Air Pipe, and Glass Fiber Reinforced Plastic Desulfurization Tower Spray Layer PipelineUS$ 1461.54 - 1507.69MOQ: 1 Set
-
Workshop Exhaust Gas Treatment, Frp Exhaust Gas Absorption Tower, Frp Scrubber Customized According to SpecificationsUS$ 4445.85 - 4595.08MOQ: 1 Unit
-
Yike Frp Fiberglass Reinforced Plastic Exhaust Gas Purification Tower, Scrubber, Tail Gas Absorption Tower Purification Equipment and Treatment DeviceUS$ 1964 - 1982.77MOQ: 1 Unit