Home > Manufacturing & Processing Machinery > Engineering & Construction Machinery > Engineering & Construction Machinery Parts > MAN 23/30,MAN 6L23/30,MAN 7L23/30,MAN 8L23/30,MAN 9L23/30 SPARE PARTS

MAN 23/30,MAN 6L23/30,MAN 7L23/30,MAN 8L23/30,MAN 9L23/30 SPARE PARTS

MAN 23/30,MAN 6L23/30,MAN 7L23/30,MAN 8L23/30,MAN 9L23/30 SPARE PARTS photo-1
AUD 1 - 99999 MOQ: 1 Piece
Key Specifications
Get Latest Price
Brand Name:
ATU MECHINAS
Place of Origin:
Algeria
Model Number:
MAN 23/30,MAN 6L23/30,MAN 7L23/30,MAN 8L23/30,MAN 9L23/30
Payment & Shipping
Payment Methods:
Port of Shipment:
shanghai
Delivery Detail:
99 days
Brand Name ATU MECHINAS
Place of Origin Algeria
Model Number MAN 23/30,MAN 6L23/30,MAN 7L23/30,MAN 8L23/30,MAN 9L23/30

Atu Mechinas's services run through the entire lifecycle of the equipment, providing comprehensive after-sales maintenance and accessory supply services.

MAN 23/30,MAN 6L23/30,MAN 7L23/30,MAN 8L23/30,MAN 9L23/30 High pressure oil pipe, sealing ring, O-ring, safety valve, explosion pressure gauge, fuel pump,  intake valve, control system, stretcher, connecting rod, connecting rod bolt Connecting rod tile, crankshaft, fuel pipe, heat exchanger, indicator valve, 

man L23/30 manufacturer,man L23/30 Production plant,man L23/30 Traders,man L23/30 factory,man L23/30 OEM factory,man L23/30 distributor,man L23/30 whole saler manufacturer,man L23/30 General agent,man L23/30 dealer,man L23/30 supplier agent,man L23/30 After sales,man L23/30 after-sale service,man L23/30 Local agent,man L23/30 Local proxy,man L23/30 Purchasing agent,man L23/30 General distributor

Sign the first 23/30 finished oil tanker order. We have ordered 2+2 finished oil tankers, of which the first 2 will be rented out for an estimated lease period of at least 5 years.

This batch of new ships will be delivered in 2026, and the unit price of each ship may be slightly higher than before. This series of ships is independently developed, designed, and built by China, and will be fully delivered by 2022.

By controlling the combustion state to reduce exhaust emissions, up to 75% of carbon emissions, 15% of nitrogen emissions, and 99% of sulfur and particulate matter emissions can be reduced without the need for an exhaust gas treatment system to meet the highest level emission requirements of the International Maritime Organization. This type of ship has also undergone deep optimization of its hull shape and is equipped with various energy-saving devices, which can effectively improve propulsion efficiency and achieve the goal of energy conservation.




Product Tags: MAN L23/30 SPARE PARTS , MAN 23/30 SPARE PARTS , MAN23/30 SPARE PARTS

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Verified Business License
Business Type
Agent
Year Established
2015
Annual Export Value
Below US$1 Million
Port of Shipment
shanghai, tianjin