Man 28/32 Spare Parts,man L28/32,v28/32 Engine Parts Maker,manufacturer,trading Company,Traders,trading Company
Atu Mechinas's services run through the entire lifecycle of the equipment, providing comprehensive after-sales maintenance and accessory supply services.
man l28/32 manufacturer,man l28/32 Production plant,man l28/32 Traders,man l28/32 factory,man l28/32 OEM factory,man l28/32 distributor,man l28/32 whole saler manufacturer,man l28/32 General agent,man l28/32 dealer,man l28/32 supplier agent,man l28/32 After sales,man l28/32 after-sale service,man l28/32 Local agent,man l28/32 Local proxy,man l28/32 Purchasing agent,man l28/32 General distributor
MAN 6L28/32,MAN 8L28/32,MAN 7L28/32,MAN 9L28/32,MAN 12v28/32,MAN 14v28/32, sensor, intake valve, intake valve seat, intake valve, control system, stretcher, connecting rod, connecting rod bolt Connecting rod tile, motor, exhaust valve, exhaust valve housing, exhaust valve seat, exhaust valve, exhaust pipe, turning machine, fuel injection pump, injector, fuel nozzle, nozzle ring, expansion joint, pulley, starter motor, cylinder head, cylinder sleeve, valve spring ring, crankshaft,
28/32 Heavy Industry has won another contract from 28/32 National Shipping Company for the construction of two 174000 cubic meter LNG ships, with a contract amount of approximately KRW 415.6 billion (approximately USD 362 million), and plans to deliver them in the second half of 2023.
It is reported that these two new ships are alternative orders in the new LNG ship lease agreement signed earlier this year between 28/32 and global energy company 28/32.
28/32 and 28/32 signed a lease agreement for a new 174000 cubic meter LNG ship, with a lease term of 7 years. It is reported that this new ship will be built by 28/32 Heavy Industry Group and is scheduled to be delivered in the third quarter of 2023. It will be operated by 28/32 and responsible for technical management. It will become the latest ship in the company's new generation of conventional Atlanticmax LNG carrier series. The contracts between 28/32 and 28/32 also include alternative leases for two other ships.
On January 11th, 28/32 Shipbuilding Ocean, the second level holding company responsible for shipbuilding business of 28/32 Heavy Industry Group, announced that the company had received an order for one 174000 cubic meter LNG ship at a cost of 207.8 billion Korean won (approximately 181 million US dollars), which will be built by 28/32 Heavy Industry and is expected to be delivered to the shipowner before the third quarter of 2023. The contract also includes alternative orders for two LNG ships of the same class.
Send Inquiry to This Supplier
You May Also Like
-
MAN 32/40,MAN 6L32/40,MAN 12V32/40,MAN 18V32/40,MAN 16V32/40,MAN 8L32/40,MAN 9L32/40 SPARE PARTSUS$ 1 - 99999MOQ: 1 Piece
-
MAN 32/40,MAN L32/40 SPARE PARTS,MAN 32/40 DIESEL ENGINE,MAN 32/40 GENERATOR SETUS$ 1 - 99999MOQ: 1 Piece
-
Man 32/40 Spare Parts,man L32/40,v32/40 Engine Parts Maker,manufacturer,trading Company,Traders,trading CompanyUS$ 1 - 99999MOQ: 1 Piece
-
MAN 32/44,MAN 6L32/44,MAN 10L32/44CR,MAN 8L32/44,MAN 9L32/44 SPARE PARTSUS$ 1 - 99999MOQ: 1 Piece
-
MAN 32/44,MAN L32/44 SPARE PARTS,MAN 32/44CR DIESEL ENGINE,MAN 32/44 GENERATOR SETEUR 1 - 99999MOQ: 1 Piece
-
Man 32/44 CR Spare Parts,man L32/44,v32/44 Engine Parts Maker,manufacturer,trading Company,Traders,trading CompanyEUR 1 - 99999MOQ: 1 Piece
-
Man 51/60df Spare Parts,man L51/60df,man V51/60df Spare Parts,51/60df Parts Agent,trading Company,tradersEUR 1 - 99999MOQ: 1 Piece
-
MAN 6L51/60DF,MAN 7L51/60DF,MAN 8L51/60DF,MAN 9L51/60DF,MAN 12V51/60DF,MAN 16V51/60DF,SPARE PARTS,DUAL FUEL ENGINE,GENERATOR SETSEUR 1 - 99999MOQ: 1 Piece
-
MAN K9Z60/105E,MAN 48/60,MAN 58/64 ENGINES,SPARE PARTSEUR 1 - 99999MOQ: 1 Piece
-
NIIGATA 6L16HS,6L16XC,6L18CX,6L20AX SPARE PARTS,NIIGATA 6L20CX,6L25BX,6L26ZG SPARE PARTS,ENGINE,GENERATOR SETUS$ 1 - 99999MOQ: 1 Piece
