Powdered Coal Boiler

Powdered Coal Boiler photo-1
Powdered Coal Boiler photo-2
Powdered Coal Boiler photo-3
Powdered Coal Boiler photo-4
Powdered Coal Boiler photo-5
US$ 1,000 - 10,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Condition:
New
Type:
Natural Circulation
Usage:
Industrial
Payment & Shipping
Payment Methods:
Port of Shipment:
Qingdao
Delivery Detail:
Delivery time depends on order quantity.
Condition New
Type Natural Circulation
Usage Industrial
Structure Fire Tube
Pressure Low Pressure
Style Horizontal
Fuel Coal-fired
Brand Name Dongyue
Model Number Powdered coal boiler
Output Steam
Dimension(L*W*H) According to client condition
Weight According to specific model
Certification ISO9001/ASME
After-sales Service Provided Engineers available to service machinery overseas

Specifications

1.ISO9001/ASME
2.The high efficiency coal boiler system
3.The boiler is equipped with auto control system

PRODUCT  FEATURES

 

 

 

1.The high efficiency coal boiler system(patent No. ZL200520002170.X)designed by Beijing Research institute
of Coal Chemistry(the China Coal Research institute)
includes 1.0~30t/h steam boiler and 0.5~21MW hot water
boiler.Their efficiency is high.and the waste emission
can be highly controlled. the investment is moderate.the
control is simply. the running cost is low.The structure
characters are as following.
Hetero-gallbladder. so the burning temperature is low and
high efficient,it is easy to discharge the ash.

 

 

 

2. The waste gas is dedusted with hop-pocket,there is almost no visible particle released to the air,and the
emission is much lower than the national requirement.
Recur to the self-desulfur technique,the sulfut content
of the waste gas is much lower than much lower than the national requirement as well as the Beijing local
requirement too.

 

 

 

3.The boiler is equipped with auto control system,so,it
can be auto controlled and adjusted,the parameter

 

 

 

4. Can be recorded continuously. We botain a big breakthrough on the auto control of coal-fiting boiler.


5.The boiler needs a small installing area,all the
operations of milling,convering,feeding,buring,dedusting
are closed,so,the control environment is good.

 

Certification

Powdered coal boiler

Powdered coal boiler

Powdered coal boiler

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2004
Factory Size
Above 100,000 square meters
Total Employees
501 - 1000 People

Recommended Categories

Explore top categories and find suppliers for your specific needs