3 Heating Zone 1700C Chemical Vapor Deposition CVD Equipment
3 heating zone 1700C chemical vapor deposition CVD equipment
Application of chemical vapor deposition CVD equipment
1.material preparation
2.precious metals preparation
mbrane and coating
Featrues of chemical vapor deposition CVD equipment
1.Upper and lower sub-structure, easy to pick and place tubes
2.High purity quartz tube, resistance high temperature 1650 ℃
3.Programmable and PID automatic control
4.Imported energy saving chamber material
5.Double liner structure chamber, the middle has gap isolation, even if the furnace temperature up to 1000 degree, furnace surface remains safe to touch
6. Furnace is equipped with an output voltage and output current detection table, can see the real time heated condition
Technical parmaters of chemical vapor deposition CVD equipment
| Model | CY-T1700-80IC-3ZV10 |
| Limiting temperature | 1700℃ |
| Working temperature | ≤1650℃ |
| Heating rate | Suggestion 0~20℃/min |
| Temperature zone | Single |
| Temperature accuracy | ±1℃ |
| Chamber size | Φ80×1300(mm) |
| Heating element | Imported alloy heating wire |
| Thermal couple | BType |
| Temperature control | PID automatic control via SCR power control |
| Heating curves | 30 steps programmable |
| Chamber material | Imported fiber |
| Heating zone | 190+250+190mm |
| Working temperature | 1300°c, 1600°c, 1300°c |
| Tube material | alundum tube |
| Tube length | 1300mm |
| Sealing type | stainless steel vacuum flange |
| Tightness | 4.03*10-3Pa |
| Current and voltage Monitoring | Analog galvanometer |
| Main power | 2.5kw |
| gas way | 3 gas can be connected |
| A way range | 100SCCM |
| B way range | 300SCCM |
| C way range | 500SCCM |
| Gasline pressure | -0.1-0.15Mpa |
| System vacuum | 5-10Pa |
| Pump connection | KF16 stainless steel Bellows, KF16 clamps, KF16 flapper valve |
| Vacuum meter | INFCON |
| Working voltage | 220V 50-60Hz |
| Standard accessories | Quartz tube, vacuum flange, tube blockage, O-ring, protective gloves, crucible furnace hook, PTFE tube, stainless steel fittings, stainless steel bellows, adapter, 5mm hex wrench |
Pictures show of chemical vapor deposition CVD equipment
Packaging of chemical vapor deposition CVD equipment
PLY WOOD BOX as below picture show. or as customer request.
Shipping and transportation
As customer request. Generally, Our mode of transport are as by sea, by air or rail transport
Payment
T/T, L/C, WEST UNION, PAYPAL, ESCROW AND ETC
Warranty
Main product is 15 month, except wearing parts.
Wearing parts as below:
Quartz tube, vacuum flange, tube blockage, O-ring, protective gloves, crucible furnace hook, PTFE tube, stainless steel fittings, stainless steel bellows, adapter, 5mm hex wrench
Factory show
Zhengzhou CY Scientific Instrument Co., Ltd is mainly engaged in the research and development, design, manufacturing and sales of equipment used in scientific researches. Independence and innovation is the company's tenet.
Processing room
Show room
Contact information
Skype ID: jennyhao8819
Whatsapp/wechat/viber:008615639272359
Tel:0086-0371-55199322
Fax:0086-0371-86036875
Website:
We are always at our service in 24 hours
Send Inquiry to This Supplier
You May Also Like
-
Vacuum PumpUS$ 110 - 150MOQ: 1 Piece
-
TWJR-B-C-140x140mm Temperature Adjustable Laboratory Hot PlateUS$ 122.1 - 130MOQ: 1 Set
-
Factory Price 100C/min Heating Rate Muffle Furnace With High TemperatureUS$ 7,500 - 7,500MOQ: 1 Set
-
SELON BPH SERIES HEATING INCUBATOR (LCD)NegotiableMOQ: 2 Sets
-
Magnet Properties/primary School Acoustic Experment Box/quality Experiment BoxUS$ 80 - 200MOQ: 5 Sets
-
Magnetic StirrerUS$ 80 - 90MOQ: 10 Sets
-
Tube Furnace Type GKD-TFUS$ 1000 - 10000MOQ: 1 Set
-
CJ-1 Magnetic Stirrer/Laboratory Magnetic StirrerUS$ 100 - 300MOQ: 1 Unit
-
Muffle Furnace/Hebi Xintianke Touch Muffle Furnace/Coal Ash DeterminationNegotiableMOQ: 1 Unit
-
HC-B063 Low Price Laboratory Equipment Industrial Heating Magnetic StirrerNegotiableMOQ: 1




