Home > Manufacturing & Processing Machinery > Mining Machinery > Other Mining Machinery > 20 TPD Gold CIL Plant Small Capacity Gold Ore Leaching And Recovery Plant

20 TPD Gold CIL Plant Small Capacity Gold Ore Leaching And Recovery Plant

20 TPD Gold CIL Plant Small Capacity Gold Ore Leaching And Recovery Plant photo-1
20 TPD Gold CIL Plant Small Capacity Gold Ore Leaching And Recovery Plant photo-2
20 TPD Gold CIL Plant Small Capacity Gold Ore Leaching And Recovery Plant photo-3
20 TPD Gold CIL Plant Small Capacity Gold Ore Leaching And Recovery Plant photo-4
20 TPD Gold CIL Plant Small Capacity Gold Ore Leaching And Recovery Plant photo-5

Product Spotlights

1. 90%-95% high gold recovery rate.
2. Universal CIL line for all gold ores.
3. Flexible capacity: 20–5000 TPD.
4. Low power & reagent cost, high efficiency.
5. Anti-corrosion structure for longer service life.
6. Carbon recycling cuts operational consumption.
7. Intelligent control, easy & labor-saving operation.
8. Combined process enables stable 24h running.
9. Globally proven & mine-adaptable CIL technology.
10. Full one-stop turnkey mining solution.
Negotiable MOQ: 1 Combo (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Warranty:
1 Year
After-sales Service:
Our Engineers Will Do Installtion And Commissioning And Training On Site If Need
Transport Package:
Export standard nude packing
Payment & Shipping
Payment Methods:
Port of Shipment:
Qingdao Tianjing Shanghai
Delivery Detail:
30 days
Warranty 1 Year
After-sales Service Our Engineers Will Do Installtion And Commissioning And Training On Site If Need
Transport Package Export standard nude packing
Trademark Staurk
Origin China

1. Product Description

The 20 TPD (tonnes per day) Gold CIL Plant is a compact, fully integrated leaching and recovery system specifically engineered for small‑scale gold mining operations. With a nominal throughput of 20 metric tonnes of ore per day, this plant bridges the gap between manual processing and large industrial facilities – offering professional metallurgical performance at an affordable capital and operating cost.

This plant is ideal for junior miners, exploration projects, artisanal formalisation, or satellite deposits that do not justify a mega‑plant but still demand reliable, consistent gold recovery. Despite its modest size, the unit incorporates the same carbon‑in‑leach (CIL) chemistry and engineering principles used in major gold mills, ensuring that you achieve maximum extraction from your ore.

Our 20 TPD solution is delivered as a pre‑engineered, modular package that includes all necessary equipment – from feeding and crushing to grinding, leaching, carbon adsorption, elution, electrowinning, and smelting. We also provide full installation support, commissioning, and operator training, so your team can confidently run the plant from day one.

2. Working Principle

The plant follows the standard CIL flowsheet, adapted for small‑scale continuous operation:

  • Ore Feed & Grinding: Run‑of‑mine ore is fed into a jaw crusher, then conveyed to a ball mill in closed circuit with a cyclone or classifier. The mill reduces the ore to a fine slurry with the optimal particle size for gold liberation.

  • Leaching & Simultaneous Adsorption: The ground slurry flows by gravity into a series of mechanically agitated CIL tanks. Lime and sodium cyanide are dosed to maintain the required pH and free cyanide level. Activated carbon is added directly into the tanks – while gold dissolves into the solution, the carbon immediately adsorbs the gold cyanide complex. This concurrent action drives the leaching reaction forward and loads the carbon with gold.

  • Carbon Movement & Gold Recovery: Loaded carbon is periodically advanced counter‑current to the pulp flow, ensuring the most heavily loaded carbon is removed from the last tank. The loaded carbon then goes to a simple elution column, where a hot caustic‑cyanide solution strips the gold. The resultant pregnant solution is sent to electrowinning cells to deposit gold onto cathodes.

  • Smelting & Tailings: The gold‑bearing sludge is collected, dried, and smelted in a small furnace to produce doré bars. The final barren pulp passes through a cyanide destruction stage (using SO₂/air or hydrogen peroxide) before safe discharge to a tailings storage facility.

All critical parameters – pulp density, pH, oxygen, and carbon concentration – are monitored with basic instrumentation, with manual or semi‑automatic controls that make operation straightforward for local crews.

3. Core Features

  • Compact & Modular Design – The entire plant is built on skid‑mounted frames, reducing onsite civil works and enabling rapid installation. The small footprint makes it suitable for remote sites with limited infrastructure.

  • Economic Scalability – At 20 TPD, the plant offers an excellent balance between recovery efficiency and investment size. It is perfect for proving a deposit, generating early cash flow, or processing high‑grade stockpiles.

  • Simple Operation & Maintenance – We have minimised mechanical complexity. Key wear parts are readily accessible, and the control logic is intuitive. A single shift crew of 2‑3 people can operate the plant after our hands‑on training.

  • Adaptable to Various Ores – The flowsheet can be fine‑tuned for oxide, transitional, or even some refractory ores by adjusting grind size, retention time, or reagent dosage – all with our metallurgical support.

  • Environmentally Conscious – The plant includes a cyanide destruction circuit and a lined tailings pond design, ensuring compliance with local environmental regulations even at small scale.

Product Tags: Gold CIL processing plant , Gold CIL plant for sale , Complete gold CIL production line

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Gold Verified Supplier
1Yr
Verified Business License
Business Type
Manufacturer
Year Established
2008
Factory Size
5,000-10,000 square meters
Annual Export Value
US$2.5 Million - US$5 Million