Digging for Gold
Introduction of the product 120-150m3 per hour capacity under digging 8 meters 80 type digging bucket digging and panning equipment digging and panning equipment introduction this set of digging and panning equipment is independently developed and designed by our company according to the customer demand, the depth of digging is 8 meters, the equipment adopts the current mainstream gold-rush technological process, the technology is selected, the operation is simple and convenient, the processing capacity is large, the recovery rate is high, and the failure rate is low. The raw materials are fed into the vibrating screen through the hopper for screening and grading: Fine Material, coarse material and waste material, in which the middle coarse material and the upper waste material are discharged directly through the waste tank to the waste area; The fine material of the lower layer of the vibrating screen is discharged into three vibrating trough through the hopper into the distributor to be sieved. Technical parameters of equipment for digging 8 m 80 bucket in 120-150 m 3 per hour
Send Inquiry to This Supplier
You May Also Like
-
Wheel Bucket Sand WasherUS$ 90000 - 700000MOQ: 1 Piece
-
Vibrating Screen for Gold Mine Gravity Separation EquipmentUS$ 50000 - 100000MOQ: 1 Piece
-
Slurry Dewatering Equipment for Fine Sand RecoveryUS$ 35690 - 95570MOQ: 1 Piece
-
Mud Dewatering EquipmentUS$ 30000 - 190000MOQ: 1 Piece
-
Dewatering Screen for Sand Washing SiteUS$ 20000 - 60000MOQ: 1 Piece
-
Dried Tailings Dehydrated SieveUS$ 70000 - 300000MOQ: 1 Piece
-
Mud Dehydration Equipment: Trihydrogen Purification BodyUS$ 100000 - 600000MOQ: 1 Piece
-
Sludge Curing EquipmentUS$ 60000 - 360000MOQ: 1 Piece
-
Shandong Mobile Crushing Station, ChinaUS$ 500000 - 510000MOQ: 1 Piece
-
China's Mineral Processing Equipment Horizontal/Vertical Fully Automatic Gold CentrifugeUS$ 20000 - 25000MOQ: 1 Piece