Home > Instruments & Meters > Test Instrument > Test Machine > GDKC-2000 Transformer On Load Tap Changer OLTC Tester

GDKC-2000 Transformer On Load Tap Changer OLTC Tester

GDKC-2000 Transformer On Load Tap Changer OLTC Tester photo-1
US$ 2000 - 5000 MOQ: 1 Set
Key Specifications
Get Latest Price
Brand Name:
Gold
Place of Origin:
China
Model Number:
GDKC-2000
Payment & Shipping
Payment Methods:
Port of Shipment:
Chongqing
Delivery Detail:
7 days
Brand Name Gold
Place of Origin China
Model Number GDKC-2000
Power Electronic
Usage Other, Transformer On Load Switch Test

Product Description
Introduction:

The tester can record switch operation waveform in overall process. The longest time is 6.4s.It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically. It has power-off protection, over-voltage protection, perpetual clock and high-speed printing.

2. Test Feature

 

1 Test transformers of type Y0  Y  Δ and display resistance value directly;
2 Automatically analyze waveform fault and mark the fault.
3 Automatically adjust resistance value and time range according to sampling data
4 Transformer type Δ is able to display to synchronization status of three phase;
5 Be able to test with winding or without winding;
6 Four terminal connection mode and provide high accuracy of resistance measurement.
7 Continuous test to save time of power off
8 Make word report
9 800×480 colorized LCD with touch screen and high speed printer
10 Store 1000 groups of data and also can be saved by USB flash disk

 

Technical Index:

3.Technical Parameters

 

1 Three phase constant current source charge,charge current: 3A/1A; 0.6A/0.2A
2 Maximum voltage of the port: 24V
3 Maximum range of transition resistance: 100Ω
4 Measuring range: 1A:0.4Ω~20Ω   0.2A:10Ω~100Ω
5 Record time of waveform:300ms
6 Sample rate: 30k
7 Resolution of time:0.1ms
8 Resolution of resistance: 0.1Ω
9 Accuracy of transition resistance: ±5% Reading±0.1Ω
Accuracy of transient time: ±0.5% Reading±0.2mS
10 Temperature: -10-40°C Humidity:
Our Service
Pre-sale Service:

•Inquiry will be replied within 24 hours. 
•Welcome to visit our factory. 
•Technical datas and operation manual sent for evaluation.

After-sale Service:
•Training how to instal the machine, training how to use the machine at our factory;
•Engineers available to service machinery overseas at customers' cost;

Packing & Delivery

 

Contact us

Heather Li

 

Mobile/Whatsapp: +86 151 2302 9823

www.cqgoldequipment.com


 


Product Tags: OLTC Tester , Tap Changer Tester , On Load tap Changer Tester , Transformer tap Changer Tester , Transformer OLTC Tester , Load tap Changer Tester

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer
Year Established
2009
Annual Export Value
US$2.5 Million - US$5 Million
Port of Shipment
Chongqing, Shenzhen, Guangdong, Hongkong

Recommended Categories

Explore top categories and find suppliers for your specific needs