Home > Manufacturing & Processing Machinery > Machine Tools > CNC Machine Tools > Hydraulic Finished Production Clamp AAC Block Packing Machine / AAC Blocks Plant

Hydraulic Finished Production Clamp AAC Block Packing Machine / AAC Blocks Plant

Hydraulic Finished Production Clamp AAC Block Packing Machine / AAC Blocks Plant photo-1
Negotiable MOQ: 1 Piece (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Brand Name:
MINGJIE
Place of Origin:
China
Model Number:
CPJJ-0001
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
7 days
Brand Name MINGJIE
Place of Origin China
Model Number CPJJ-0001
Delivery Time:45days after deposit
Certification:ISO9001:2008

AAC hydraulic finished production clamp AAC Block Packing Machine / AAC Block

Finished product hoisting tool (see attached drawing) is a supporting component in the autoclave aerated concrete packing line. Its tightening is done by a clamping arm set. It is a special hosting tool with the function of delivering steam-cured concrete blocks coming out of autoclave to the finished product line or to be loaded on trucks or to be packed.
 

1. Function


a) Its function is to deliver steam-cured concrete blocks to the finished product line or to be loaded on trucks or to be packed.
 

2. Major technical specifications 


a) Maximum overall dimensions: 
5444 mm (length) × 1010 mm (width) × 3733 mm (height)
b) Mass: 3291.2 kg
 

3. Structure: 


This finished product hoisting tool is made up of the following parts; beam, clamping arm set, top beam, bottom beam, guide shaft, connecting rod, shaft, etc.
Both the top and bottom beams are made of steel channels and plates. They feature good rigidity, simple structure, easy mounting and convenient adjustment.
The clamping arm is controlled by a hydraulic cylinder.
 

4. Operation: 


The sling on the overhead crane lifts up the shaft connected with the top beam so that the top beam moves up along the guide frame. The clamping arm is controlled by the hydraulic cylinder so that it can do clamping and loosening and complete the motion of clamping the concrete block.
 

5. Assembly: 


Mount the clamping arm set with the top beam and the hydraulic cylinder.
 

6. Trial lifting and adjustment: 


Trial lifting: 
After assembling the top beam and the clamping arm on site, connect the crane sling with the pulley. Move the crane sling up and down and the clamping arm should be able to do clamping and loosening freely and balancedly without jamming or swinging to and fro.
 

7. Safety: 


Do not anybody to stand under the hoisting tool in times of production.

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Total Employees
101 - 200 People
Main Markets
North America, South America, Eastern Europe
Location
Huzhou, Zhejiang, China