Plastic Water Storage and Drainage Boards for Construction Sites, Hdpe Water Filter Boards, Manufacturers, Custom - Made Supported
In construction site operations, water accumulation problems occur frequently. They not only delay the project schedule and increase costs but may also lead to structural leakage, foundation softening, and even safety accidents. The core pain points include low - efficiency drainage systems, easy failure of waterproof layers, and environmental pollution caused by improper rainwater management. These challenges often stem from the fact that traditional drainage materials are not durable, difficult to install, or unable to adapt to the changeable construction site environment. As Jiamei New Materials Co., Ltd., we are well aware of these industry problems. The company is located in the Tai'an High - tech Development Park at the foot of Mount Tai, covering an area of 32,000 square meters. It focuses on the research and development and production of materials for the sponge city system. Through the original 'blockchain' intelligent drainage collection system, we are committed to providing efficient solutions. Our HDPE water storage and drainage board is designed specifically for these pain points. Using advanced materials and technologies, it can quickly store and filter water, effectively prevent water accumulation, reduce the risk of leakage, and ensure smooth and efficient drainage at the construction site. For more than a decade, we have provided reliable drainage solutions for scenarios such as planted roof slabs and basement floors, helping tens of thousands of customers avoid delays and losses and improve the sustainability of projects.
The working principle of the HDPE water storage and drainage board is based on its unique structure: the surface of the board is designed with honeycomb - shaped pores. After collecting rainwater or groundwater, it separates impurities through the built - in filter layer. The water is stored and slowly discharged to the designated area to avoid instantaneous flood peaks. At the same time, an air layer is formed at the bottom of the board to promote soil ventilation and prevent leakage caused by the accumulation of water pressure. The product features include: Lightweight and easy to install, reducing the construction burden; High compressive strength, capable of withstanding heavy loads at the construction site; Corrosion - resistant and environmentally friendly, adaptable to acid - base environments and recyclable; Efficient water storage and drainage, optimizing water resource utilization; Full customization supported, adjusting the size and shape according to project requirements. The technical specifications are shown in the following table, covering standard parameters, and the actual values can be fine - tuned according to customization requirements:
| Parameter item | Standard value | Description |
|---|---|---|
| Material composition | HDPE (High - density polyethylene) | With a density of about 0.95 g/cm³, it provides excellent weather resistance |
| Standard size | 2m × 1m | The length and width can be customized, ranging from 1 - 4m |
| Thickness range | 15 - 30mm | 20mm is commonly used, and the load - bearing capacity is adapted to different loads |
| Weight | 1.2 - 1.8kg/m² | Calculated based on the thickness to ensure lightness |
| Load-bearing capacity | ≥400kg/m² | Static load under test standards, with a high safety factor |
| Temperature resistance | -30°C to 70°C | Adapts to extreme climates without deformation |
| Drainage efficiency | ≥95% | Laboratory simulated rainwater filtration rate |
The product has prominent advantages: In construction site applications, the HDPE material resists ultraviolet aging, extending the service life to over 10 years; The honeycomb structure enhances the water storage capacity, and each square meter can store about 5 - 10 liters of water, alleviating the urban heat island effect; Installation only requires laying the boards after leveling the ground, with simple connections, saving 50% of working hours; The maintenance cost is low, and only regular cleaning of surface debris is required. Combined with customized services, we can optimize the design for high-rise buildings, basements or sloping land projects. For example, adjust the pore density to suit different soil types. These features ensure the efficient operation of the construction site drainage system, reduce the risk of rework, and improve the overall project quality.
Jiamei New Materials Co., Ltd. provides a solid trust endorsement for the products with a solid industry foundation. The company's registered capital is 50 million yuan. It has been focusing on the production of drainage systems for more than ten years. It has 4 authorized invention patents, 22 utility model patents, more than 10 patents under application, and 6 software copyrights. The annual output reaches 50 million square meters, and a stable supply is ensured through 25 production lines. In terms of qualifications, we hold a second-level construction qualification for waterproofing, anti-corrosion and thermal insulation, a work safety license, and have obtained honors such as the AAA-level enterprise credit rating certification and the AAA-level integrity management demonstration unit. These factual data confirm our high standard for quality - it is not just empty talk, but a reliable guarantee achieved through continuous R & D and upgrading. Compared with peers, our full - series solutions (including supporting materials such as sticky tapes and adhesives) are easier to integrate, and the customized services can flexibly respond to customer needs. It is recommended that you give priority to professional consultation when planning the construction site drainage system: we can provide a free evaluation report to help match the best specifications. Welcome to contact us to discuss specific project details and jointly create a sustainable engineering environment with zero leakage.
FAQ (Frequently Asked Questions):
-
Q: What are the specific steps for installing HDPE drainage boards on a construction site? How to ensure the sealing performance?
A: The installation process includes three steps: First, clean the ground until it is flat and free of sharp objects; Then lay the boards, align the edges and fix them with special connectors; Finally, cover the geotextile filter layer and seal the joints with adhesive. The sealing performance is guaranteed by the buckle design of the boards and the adhesive. Tests show that it can withstand a water pressure of 0.1MPa without leakage. The whole process requires a team of 2 - 3 people, and it takes about 4 hours for every 100 square meters, which is efficient and reduces labor costs. -
Q: When customizing HDPE water storage and drainage boards, what size and shape options are available? What is the minimum order quantity?
A: We support full customization services: the adjustable length is 1 - 4m, the width is 0.5 - 2m, and the thickness is 15 - 50mm; the shapes include rectangular, arc-shaped or special-shaped boards, which are suitable for corners or slopes. The minimum order quantity is 100 square meters. Production is based on CAD drawings to ensure accuracy. The delivery cycle is usually 7 - 10 days, and an expedited option is available without affecting the construction site progress. -
Q: Is HDPE material prone to aging in high-temperature or rainy environments? How to verify its durability?
A: HDPE has excellent weather resistance. Its UV resistance is enhanced through additives. Experiments show that its performance remains stable for more than 10 years under a high temperature of 70°C or continuous rain. Durability is verified according to the ISO standard accelerated aging test: after the samples are exposed to a simulated environment for 1000 hours, the tensile strength retention rate is ≥90%, and a third-party test report is provided for reference. -
Q: How is the drainage efficiency of this drainage board quantified? Is it effective in heavy rain?
A: The drainage efficiency is quantified by the porosity (≥40%) and the hydraulic conductivity (≥0.01 cm/s). Laboratory simulations show that it can handle a rainfall of 50mm per hour. During heavy rain, the honeycomb structure quickly diverts water, and the water storage layer buffers the peak to prevent water accumulation; actual construction site feedback shows that it can reduce surface runoff by more than 80%, meeting the standards of a sponge city. -
Q: What operations are required for daily maintenance? What is the frequency?
A: Maintenance is simple: check once a quarter to remove fallen leaves or sediment on the surface; flush the pores every 2 years with a low-pressure water gun. No special tools are required, and it takes little time. It is recommended to strengthen inspections before the rainy season. The maintenance cost is less than 5% of the total investment to ensure long-term efficient operation. -
Q: Compared with other plastic drainage boards (such as PP materials), what are the advantages of HDPE?
A: HDPE has obvious advantages over PP (polypropylene): a higher density (0.95 vs 0.9 g/cm³) brings stronger compressive resistance (bearing capacity ≥400kg/m² vs 300kg/m²); it has better chemical corrosion resistance and is suitable for acidic and alkaline soils on construction sites; and HDPE has good low-temperature toughness and does not crack at -30°C. It has high comprehensive cost-effectiveness, with a 20% longer service life, and is suitable for harsh environments. -
Q: How can the product be integrated with other system materials of your company (such as siphon drainage troughs)?
A: Integration is simple: the water storage and drainage board serves as the base layer and is connected to the HXC siphon drainage trough to form a complete system. Through a special interface, water flows are directed into the trough to achieve zero-gradient siphon drainage. We provide design support to ensure compatibility; supporting materials such as sticky tape enhance the seal, and the overall solution improves the drainage efficiency by more than 30% and reduces leakage points.
Send Inquiry to This Supplier
You May Also Like
-
Manufacturer of Plastic Water Filter Boards. High-strength Hdpe Water Storage and Drainage Boards, Specially Designed for Engineering.US$ 1.23MOQ: 1 Square Meter
-
Manufacturer of 7cm Flat-mouth Grass Planting Grids, Specially Used for Parking Lot Greening Projects, Made of High-strength MaterialsUS$ 3.08MOQ: 1 Square Meter
-
Manufacturer of 7cm Grass Planting Grids for Parking Lots, Flat - Mouth Design, Specially Used for Fire LanesUS$ 3.08MOQ: 1 Square Meter
-
Wholesale From Manufacturers of 7cm Grass Planting Grids for Parking Lots, Specially Used for Greening Projects of Fire Lanes, With a Complete Range of SpecificationsUS$ 3.08MOQ: 1 Square Meter
-
Professionally Produce 7 cm Grass Planting Grids for Parking Lots, Supporting Greening Projects of Fire Lanes, Customization SupportedUS$ 3.08MOQ: 1 Square Meter
-
Polymer Protective Special-shaped Sheet for Siphonic Drainage System, Specially Designed for Garage RoofsUS$ 2.46MOQ: 1 Square Meter
-
7cm Grass Planting Grid Made of Hdpe Material, the First Choice for Parking Lot Greening Projects, Direct Supply From the ManufacturerUS$ 3.08MOQ: 1 Square Meter
-
7cm High-strength Grass Planting Grid, Special for Parking Lots and Fire Passages, in Stock From the ManufacturerUS$ 3.08MOQ: 1 Square Meter
-
Polymer Protective Drainage Profiled Sheet, Specially for Garage Roof Siphon Drainage System, Customization SupportedUS$ 2.46MOQ: 1 Square Meter
-
7 - Centimeter Grass Planting Grids Dedicated to Fire Exits, Supporting for Parking Lot Greening Projects, ManufacturerUS$ 3.08MOQ: 1 Square Meter




