Home > Manufacturing & Processing Machinery > Engineering & Construction Machinery > Pile Driver > Factory Direct Sales of Photovoltaic Foundation Pile Drivers, Crawler Walking Screw Drilling Rigs, 360-degree Rotating Dual-power Pile Drivers

Factory Direct Sales of Photovoltaic Foundation Pile Drivers, Crawler Walking Screw Drilling Rigs, 360-degree Rotating Dual-power Pile Drivers

Factory Direct Sales of Photovoltaic Foundation Pile Drivers, Crawler Walking Screw Drilling Rigs, 360-degree Rotating Dual-power Pile Drivers photo-1
Factory Direct Sales of Photovoltaic Foundation Pile Drivers, Crawler Walking Screw Drilling Rigs, 360-degree Rotating Dual-power Pile Drivers photo-2
Factory Direct Sales of Photovoltaic Foundation Pile Drivers, Crawler Walking Screw Drilling Rigs, 360-degree Rotating Dual-power Pile Drivers photo-3
US$ 13230.77 1 Unit
US$ 12000 ≥2 Unit
Key Specifications
Get Latest Price
Main Markets:
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe, Central America, Northern Europe, Southern Europe, South Asia, Domestic Market
Location:
Jining, Shandong, China
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
Delivery time depends on order quantity.

1. Scope of application

It is used for pile pressing in soft soil layers, such as pile foundation construction in foundation, seaport, bridge, reservoir power station, and national defense projects. It is widely applicable tophotovoltaic spiral pile rotation projects, drilling projects, geological exploration, construction projects and other engineering.

2. Features

1.  An advanced hydraulic system and high - quality hydraulic components with strict assembly processes ensure the durability of the hydraulic system. The oil pump power head has a torque of 2000nm, which guarantees the working stability and mechanical durability of the pile driver.

2.  It adopts a domestic high - quality crawler chassis. It has high strength and good stability, conforms to the design concept of industrial aesthetics, and provides a more spacious working space for operators.

3.  The production process is more reasonable. All wear - resistant parts are heat - treated, the welding process is rigorous to reduce deformation, and the testing equipment is complete.

3. Product parameters

Model

S890Crawler-type photovoltaic pile driver

Power equipment

Engine

4105-4108 engine 

Generator set

50kw

Power head

22 motor

Drilling depth

3m

Drilling diameter

100-500mm(Drill pipe diameter can be customized)

Drill pipe rotation speed

120r/min

Main pump model

CBG1-F040/040

Main pump speed

2000-2400L/min

Main pump pressure

30Mpa

Main valve flow

100L/min

Main pump torque

2000N·m

Air compressor

None

Standard configuration

Yes

Drilling rocks (hardness F = 6 - 20)

Strong wind cooling

Yes

Climbing gradient

30°

Travel speed

1 - 15KM/h

Overall dimensions

5300*2200*2400mm

Track shoe width

400mm

Gross weight of the machine

3.8-4.8(t)

     





Note: The product parameters are for reference only. Please consult the customer service for specific parameters.









Product Tags: Crawler photovoltaic pile driver , Screw pile driver , Dual-power foundation pile driver

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Verified Business License
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe, Central America, Northern Europe, Southern Europe, South Asia, Domestic Market
Location
Jining, Shandong, China

You May Also Like