Home > Industrial Equipment & Components > Pump & Vacuum Equipment > Water Pump > Fiyuan Water Industry Integrated Sewage Lifting Pumping Station Manufacturer, Integrated Sewage Pumping Station

Fiyuan Water Industry Integrated Sewage Lifting Pumping Station Manufacturer, Integrated Sewage Pumping Station

Fiyuan Water Industry Integrated Sewage Lifting Pumping Station Manufacturer, Integrated Sewage Pumping Station photo-1
Fiyuan Water Industry Integrated Sewage Lifting Pumping Station Manufacturer, Integrated Sewage Pumping Station photo-2
Fiyuan Water Industry Integrated Sewage Lifting Pumping Station Manufacturer, Integrated Sewage Pumping Station photo-3
Fiyuan Water Industry Integrated Sewage Lifting Pumping Station Manufacturer, Integrated Sewage Pumping Station photo-4
Fiyuan Water Industry Integrated Sewage Lifting Pumping Station Manufacturer, Integrated Sewage Pumping Station photo-5
US$ 29800 - 30000 MOQ: 1 Combo
Key Specifications
Get Latest Price
Application:
Other
Power:
Other
Start Up:
Other
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
80 days
Application Other
Power Other
Start Up Other
Type Other

FRP Pump Integrated Prefabricated Pump Station vs. Traditional Concrete Pump Station Analysis: 

Construction Cycle: 

Integrated Prefabricated Pump Station:Factory prefabricated, on-site only need pit excavation, foundation and lifting connection, shortening the construction period by 50-70%. Usually can be completed in a few days to a few weeks.

Traditional concrete pumping station: on-site binding of reinforcement, supporting moulds, pouring and maintenance of concrete, complex processes, greatly affected by the weather, long construction period (months).

Civil engineering volume and cost: 

Integrated precast pumping station: the pit requirements are relatively simple and the backfilling volume is small. The total civil engineering cost is lower than the traditional way.

Traditional concrete pumping station: need large, solid concrete pit and structure, earth excavation, concrete, high labour costs.

Equipment and Installation: 

Integrated Prefabricated Pumping Station: Core equipment (pumps, control systems, pipelines, grids, etc.) are integrated and installed and tested in the factory, with controlled quality and quick on-site installation.

Traditional concrete pumping station: equipment to be purchased separately, transport, site-by-site installation and commissioning, coordination links, quality by the site conditions.

Quality and sealing: 

Integrated precast pumping station: the cylinder (FRP/HMPP) is standardised in the factory, with good integrity, leakage prevention and excellent corrosion resistance.

Traditional concrete pumping station: the quality of site pouring is affected by workers' skills, materials, weather, easy to cracks, leakage, high maintenance costs.

Footprint: 

Integrated Prefabricated Pumping Station:Compact structure, optimised design, far smaller footprint than traditional pumping stations. Especially suitable for space-constrained areas.

Traditional concrete pumping station: large structure, need more space for construction and installation.

Environmental impact: 

Integrated precast pumping station: construction noise, dust, less construction waste; factory production is more environmentally friendly 

Traditional concrete pumping station: on-site pouring noise, dust pollution, and produce a large amount of construction waste.

Service life: 

Integrated precast pumping station: corrosion-resistant cylinder (especially FRP) design life is usually more than 30-50 years.

Traditional concrete pumping station: long life of the concrete structure itself, but vulnerable to leakage, corrosion of steel, improper maintenance will be significantly shortened.

Maintenance and Overhaul: 

Integrated Prefabricated Pumping Station: Optimisation of space inside the cylinder, with its own maintenance platform/climbing ladder, maintenance is relatively convenient. Intelligent control system facilitates remote monitoring.

Traditional concrete pumping station: space may be confined, ventilation, lighting conditions may be poor. Maintenance environment is relatively harsh.

Long-term operating costs: 

Integrated precast pumping station: good sealing reduces leakage losses; high efficiency pumps and intelligent control saves energy; corrosion resistance reduces maintenance frequency and costs.

Traditional concrete pumping station: leakage may lead to increased pumping costs; maintenance frequency and costs (especially to deal with leakage, corrosion) may be higher.


Product Tags: Integrated sewage pumping station , sewage pumping station , Fibreglass reinforced plastic pumping station

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Verified Business License
Business Type
Manufacturer
Year Established
2013
Port of Shipment
anhui
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe, Central America, Northern Europe, Southern Europe, South Asia, Domestic Market