Home > Electrical & Electronics > Power Transmission & Transformer > Transformer > 5SHY3545L0016 3BHB020720R0002 3BHE019719R0101 GVC736BE101

5SHY3545L0016 3BHB020720R0002 3BHE019719R0101 GVC736BE101

5SHY3545L0016 3BHB020720R0002 3BHE019719R0101 GVC736BE101 photo-1
US$ 1033 - 2253 MOQ: 1 Piece
Key Specifications
Get Latest Price
Brand Name:
ABB
Place of Origin:
China
Model Number:
5SHY3545L0016 3BHB020720R0002 3BHE019719R0101 GVC736BE101
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
1 days
Brand Name ABB
Place of Origin China
Model Number 5SHY3545L0016 3BHB020720R0002 3BHE019719R0101 GVC736BE101

Brand:ABB

Type:5SHY3545L0016 3BHB020720R0002 3BHE019719R0101 GVC736BE101

Origin:  the Swiss

Warranty: 365 days

Colour: new/used

Shipping method: Courier delivery

Module of PLC, DCS, ESD system card, the card is a vibration monitoring system, steam turbine control system module, the advantages of the gas generator spare parts brand: Allen Bradley, BentlyNevada, ABB, Emerson Ovation, Honeywell DCS, Rockwell ICS Triplex, FOXBORO, Schneider PLC, GE Fanuc, Motorola, HIMA, TRICONEX, Prosoft etc. Various kinds of imported industrial parts

Our main products are widely used in metallurgy, petroleum, glass, aluminum manufacturing, petrochemical industry, coal mine, papermaking, printing, textile printing and dyeing, mechanical, electronic manufacturing, automobile manufacturing, plastic machinery, electric power, water conservancy, water treatment/environmental protection, boiler heating, energy, power transmission and distribution and so on.

64 MHz, 32-Bit Floating Point Central Processing Unit, 1 Mbyte Memory, for IC66* Triple Modular Redundancy Systems shipped with the PLC programming software, for additional guidelines. Installation should not be attempted without referring to the applicable Programmable Controller Installa- tion Manual. Connect the battery to either of the battery connectors on the module (see Figure 2). Put the toggle switch in the STOP position. Put the keyswitch in the Memory Protection OFF position. Make sure that rack power is off. Install the CPM 790 module in slot 1 of rack 0. Turn on power. The module should power up and the top LED should blink. When the diagnostics have completed successfully, the top LED stays on and the second and third LEDs are off. The fourth LED is off if the keyswitch is in the OFF position. The CPU is now ready to be programmed (if connected parallel, the CPU can be programmed regardless of key position). After the program has been verified the toggle switch can be moved to the appropriate operation mode position. The LEDs indicate the position of the toggle switch, memory protection status, and the state of the program. Programmer Connection, Parallel For a parallel interface (MS-DOS programmer only) the programmer is connected to the top port on the Bus Transmitter Module (IC697BEM713). Consult Reference 1 for a description of programming functions.

Serial Port The 15-pin D-connector provides the connection to an RS-485 compatible serial port on the CPU (see Figure 3). This port provides a serial connection to a Work Station Interface board installed in the programming computer. The serial connection can also be made from the serial port on the CPU to the serial port on the programming computer, or other serial device, through the RS-422/RS-485 to RS-232 Converter (IC690ACC900) or RS-232 to RS-422 Miniconverter (IC690ACC901). This connection can be made with available cables or you may build cables to fit the needs of your particular application. 

See reference 3 for more information on serial communications. For more detailed information on configuration of TMR systems and communications between PLCs in the system, refer to the Modular Redundancy Flexible Triple Modular Redundant (TMR) System User’s Manual. Programmer Connection, Ethernet TCP/IP Connecting your programmer via an Ethernet TCP/IP network requires installation of an Ethernet Interface module in the PLC. This can be either the Ethernet Controller, IC697CMM741, or Ethernet Interface (Type 2), IC697CMM742. Before connecting your programmer and PLC to the Ethernet TCP/IP network you must set the IP address in the Ethernet Interface. After setting the IP address, connect the PLC and the programmer running Windows software to the Ethernet Interface. For more detailed information on Ethernet TCP/IP, refer to the TCP/IP Ethernet Communications (Type 2) User’s Manual, and the Windows programming manual, GFK-1295.

Product Tags: Control processor , Robot module , DCS, PLC card

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Verified Business License
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe, Central America, Northern Europe, Southern Europe, South Asia, Domestic Market

Recommended Categories

Explore top categories and find suppliers for your specific needs