Home > Electrical & Electronics > Power Transmission & Transformer > Transformer > UFC719AE01 3BHB003041R0001 3BHB000272R0001

UFC719AE01 3BHB003041R0001 3BHB000272R0001

UFC719AE01 3BHB003041R0001 3BHB000272R0001 photo-1
US$ 1110 - 2020 MOQ: 1 Piece
Key Specifications
Get Latest Price
Brand Name:
UFC719AE01 3BHB003041R0001 3BHB000272R0001
Place of Origin:
China
Model Number:
UFC719AE01 3BHB003041R0001 3BHB000272R0001
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
1 days
Brand Name UFC719AE01 3BHB003041R0001 3BHB000272R0001
Place of Origin China
Model Number UFC719AE01 3BHB003041R0001 3BHB000272R0001

Brand: ABB

Type:UFC719AE01 3BHB003041R0001 3BHB000272R0001

Origin: the Swiss

Warranty: 365 days

Colour: new/used

Shipping method: Courier delivery

Baseplate cable connections: a. Connect the power leads and, if applicable, power supervision signals from SS82x to screw terminals SA and SB (see Figure 28 on page 83). b. Connect the Control Network cables to CN1 (single connection) or CN1 + CN2 (redundant connection). c. Connect the serial protocol to COM3. d. Connect the Control Builder to COM4 with cable TK212 (if required for changing an IP address etc). Otherwise connect the Control Builder to the Control Network. 6. Connect the optical ModuleBus to the optical contacts on the processor unit (see Figure 2 on page 32 and Figure 40 on page 131). Information regarding optical cable selection and cable length is provided in the S800 I/O documentation. 7. The PM8xx is supplied with an internal back-up battery. When the battery is to be used, place it in the Internal Battery Holder (see Figure 63 on page 193). When the external SB821/SB822 battery unit is to be used, install it according to the instructions in Installing the SB821 External Battery Unit on page 143/Installing the SB822 Rechargeable External Battery Unit on page 144. Note that connection to the optical ModuleBus is identical to that for the processor unit and for the FCI in S800 I/O (see Figure 54 on page 160.) Do not place the internal back-up battery in the battery holder until the AC 800M Controller has been powered-up normally and the memory back-up function has been activated, that is, the B(attery) LED flashes. If no normal power supply is connected to the processor unit with the battery in place, then the CPU memory will immediately start to consume battery power.

Always install a fresh internal or external battery at the end of the installation phase. The original battery is heavily utilized due to frequent blackouts during system installation.

A TB850 male CEX-Bus termination unit is supplied with each package (PM851K01, PM851AK01, PM856K01, PM856AK01, PM860K01, PM860AK01, PM861K01, PM861AK01, PM864K01, PM864AK01 and PM865K01) of the PM8xx/TP830 processor unit. PM851/PM851A is restricted to a maximum of one CEX module.

Product Tags: DCS module , The PLC card a , Industrial control automation

Send Inquiry to This Supplier

Message
0/5000
Want the best price? Post an RFQ now!
Business license
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe, Central America, Northern Europe, Southern Europe, South Asia, Domestic Market

Recommended Categories

Explore top categories and find suppliers for your specific needs