KUC711AE101 3BHB004661R0101

KUC711AE101 3BHB004661R0101 photo-1
US$ 1104 - 2014 MOQ: 1 Piece
Key Specifications
Get Latest Price
Brand Name:
KUC711AE101 3BHB004661R0101
Place of Origin:
China
Model Number:
KUC711AE101 3BHB004661R0101
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
1 days
Brand Name KUC711AE101 3BHB004661R0101
Place of Origin China
Model Number KUC711AE101 3BHB004661R0101

Brand: ABB

Type:KUC711AE101 3BHB004661R0101

Origin: the Swiss

Warranty: 365 days

Colour: new/used

Shipping method: Courier delivery

Personnel and Process Safety A control system is a tool used to control various processes. Responsibility for attaining and maintaining a satisfactory level of safety rests with the personnel who engineer, operate and maintain the equipment. It is important to have an extensive knowledge of all control functions, the inherent safety risks that may be involved in the process, and to possess the imaginative ability to anticipate situations in which accidents may occur. The following Safety Instructions must be observed: • Take care when: – fitting or removing units – connecting or disconnecting cables – resetting or switching units to manual operation • For hazardous locations special restrictions apply, see Appendix E, Standards. • Never connect the equipment to the mains power supply during installation work. • Take extreme care when connecting the system to the mains power supply. Injury or death can be the result of incorrect procedures. • Ensure that all personnel operating or maintaining the installation know the exact location of and how to operate the equipment isolating safety switch and the mains power supply isolating switch. • When the process sub-sections have been checked and a test run has been performed, a person responsible must check the interlocking chains etc. All concerned personnel must be fully informed regarding test runs to be performed.

• Process technicians are to be present when testing and operating process objects. • Never activate any System Initialization push-button if any uncertainty exists regarding exactly what occurs within the system during initialization. ALWAYS CHECK FIRST. • Remember at all times, that the control system can be controlled from a remote engineering station, connected at another node via Control Network. • Remember, the AC 800M Controller will start automatically when voltage is applied.

Product Tags: DCS module , The PLC card a , Industrial control automation

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Verified Business License
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe, Central America, Northern Europe, Southern Europe, South Asia, Domestic Market

Recommended Categories

Explore top categories and find suppliers for your specific needs