Home > Construction & Decoration > Geosynthetics Products > Geocomposite > FDP Casing Joint 510mm With Coupling 254mm Used for Full Displacement Pile

FDP Casing Joint 510mm With Coupling 254mm Used for Full Displacement Pile

FDP Casing Joint 510mm With Coupling 254mm Used for Full Displacement Pile photo-1
US$ 100 - 3000 MOQ: 1 Piece
Key Specifications
Get Latest Price
Brand Name:
huachang xingye
Place of Origin:
China
Model Number:
hc2021090401
Payment & Shipping
Payment Methods:
Port of Shipment:
tianjin
Delivery Detail:
Delivery time depends on order quantity.
Brand Name huachang xingye
Place of Origin China
Model Number hc2021090401

FDP auger 360mm with 254mm coupling for full displacement pile match bauer soilmec drill rig

FDP auger 400mm with 254mm coupling for full displacement pile match bauer soilmec drill rig

FDP auger 410mm with 254mm coupling for full displacement pile match bauer soilmec drill rig

FDP auger 600mm with 254mm coupling for full displacement pile match bauer soilmec drill rig

FDP auger 620mm with 254mm coupling for full displacement pile match bauer soilmec drill rig

FDP full displacement pile extension pipe 510mm used for pile foundation

FDP casing joint 510mm used for full displacement pile

Tianjin huachang xingye techmology co ltd produce fdp auger 510mm for full displacement pile

advantage of full displacement pile is the relatively simple technology, where no temporary casings are used,While the full displacement auger is screwed into the ground, with the lower opening plugged by a bottom plate, the soil gets

completely displaced and thus compacted.

The borehole stays dry without any excavation is taking place. This silent and vibration-free drilling method is highly suitable

for jobs, where the existing ground water table cannot be disturbed, or if the soil is contaminated and an exchange of the

contaminated soil is excluded, as well as on jobs, where adjacent buildings need to be protected.

The borehole-wall is supported at all times and the risk of collapsing does not exist. During the concreting process the full

displacement auger continues to turn clockwise while being extracted, so that the tangential reamers creating spiral-like grooves

in the borehole wall. These grooves are filled by the static pressurized concrete and thus the load-carrying capacity of the pile

increases considerably. 

Tianjin huachang xingye technology co ltd

Email info@tjdrilling.com  whatsapp 008618902059907


Product Tags: FDP casing joint 510mm , coupling 254mm

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Verified Business License
Business Type
Manufacturer
Year Established
2001
Port of Shipment
tianjin , shanghai
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe, Central America, Northern Europe, Southern Europe, South Asia, Domestic Market

Recommended Categories

Explore top categories and find suppliers for your specific needs