Home > Electrical & Electronics > Power Transmission & Transformer > Transformer > TKBTZ-Ⅲ-1600KVA Transformer Comprehensive Test System

TKBTZ-Ⅲ-1600KVA Transformer Comprehensive Test System

TKBTZ-Ⅲ-1600KVA Transformer Comprehensive Test System photo-1
Negotiable MOQ: 1 Piece (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Brand Name:
GDMK
Model Number:
TKBTZ-Ⅲ-1600KVA
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
Delivery time depends on order quantity.
Brand Name GDMK
Model Number TKBTZ-Ⅲ-1600KVA

With the increase of power transmission and transformation projects and the continuous expansion of power grids, the successive transformation of urban and rural power grids across the country, the number and capacity of power transformers on-line are increasing. To better serve the electricity

For power transmission and transformation enterprises, our company has specially tailored TKBTZ-Ⅲ-1600kVA for small and medium-sized power transformation enterprises with high degree of automation, simple and fast operation, accurate testing, low failure rate and high integration.

Transformer comprehensive test system, this system is suitable for no-load test, load test, transformation ratio measurement, DC resistance measurement, power frequency withstand voltage test, and no-load test of distribution transformers with a voltage of 10kV and a capacity of 1600kVA and below.

The induction withstand voltage test is unified, integrated, digitized, mechanical failures and reading errors are reduced, and the accuracy and applicability of the overall test system are improved. Make factory testing easier and faster

Czechoslovakia.

         The system has two operation modes (the two operation modes are interlocked, and can only work in one operation mode). The original button operation mode of the transformer integrated test bench is retained, and the microcomputer operation method is added.

This mode of operation only needs to click the mouse on the computer monitor to complete the test. All operations are executed by the PLC in the system starting its command execution unit to complete the test. In addition, the system is also configured

The video surveillance system monitors the test area, making it safer and more reliable. The system integrates test-one-time wiring, test control, monitoring, measurement, protection, display, data acquisition, analysis and processing,

Measurement control, storage, printing, and protection are integrated, and the entire test process is automatically completed. It has the outstanding advantages of high efficiency and high precision.


Product Tags: Transformer comprehensive test system , Transformer comprehensive test bench

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Verified Business License
Business Type
Manufacturer
Year Established
2014
Main Markets
Southeast Asia

Recommended Categories

Explore top categories and find suppliers for your specific needs