Home > Electrical & Electronics > Power Transmission & Transformer > Transformer > SXHGQ-H Automatic High-voltage Three-phase Combined

SXHGQ-H Automatic High-voltage Three-phase Combined

SXHGQ-H Automatic High-voltage Three-phase Combined photo-1
Negotiable MOQ: 1 Piece (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Brand Name:
gdmk
Place of Origin:
China
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
Delivery time depends on order quantity.
Brand Name gdmk
Place of Origin China

SXHGQ-H automatic high-voltage three-phase combined transformer calibration station, also known as transformer calibration station, transformer calibration device, transformer calibration device, transformer detection device, SXHGQ-H automatic

The combined transformer verification device changes the current traditional single-phase inspection method, realizes the verification of the combined transformer, meets the requirements of the current national standards and industry standards (test guidelines), and is easy to implement

Inspection, it does not require multiple wiring tests in the current single-phase method, which can save a lot of manpower and material resources and improve work efficiency. It consists of a combination of transformer error data management software, transformer calibrator,

It is composed of voltage and current load box, electronic power source and standard transformer. RS485 communication is adopted between the components to realize the automatic verification of the multi-phase voltage and current of the three-phase combined transformer in turn.

It is suitable for measurement and test centers of power grid companies, power management and measurement departments of power supply companies, national measurement and test institutions at all levels, and large industrial and mining enterprises.


Measurement object Low voltage transformer, high voltage transformer, metering box

Measurement limit Current primary: 5A~1000A Current secondary: 5A, 1A

Voltage once: 6kV~35kV Voltage twice: 200V, 100V, 100 V√3, 100V/3

 

 


Combined transformer tester

Test range Ratio difference (%): 0.0001~199.9 Resolution: 0.0001%

Angle difference (’): 0.001~999.9 Resolution: 0.001’

Test accuracy level 2.0

In-phase component (f) X=(X×2%+Y×2%±2 words)

Orthogonal component (δ) Y=(X×2%+Y×2%±5 words)

Programmable power supply

Power input AC 220V±10V

 Frequency (50Hz±0.5Hz)

Output voltage AC 0~300V

Control method: automatic/manual

Output capacity Current source part 10kVA

 


 

Standard current transformer with current booster

Primary current 5A, 10A, 15A, 25A, 30A, 40A, 50A, 60A, 75A, 100A, 150A, 200A, 300A, 400A, 500A

Secondary current 5A 1A (optional)

Accuracy grade 0.05S grade 0.02S grade (optional)

Input voltage 0~250V

Rated capacity 5kVA

Rated load 5VA

Power factor 1.0

Rated voltage 42kV

 

 

Standard voltage transformer with booster

Primary voltage 6kV, 6kV/10kV, 10kV/35kV, 35kV

Secondary voltage 100V, 100/V

Accuracy level 0.05, 0.02 level (optional)

Input voltage 0~250V

Rated capacity 0.5kVA

Rated load ≤0.25VA

Power factor 1.0

Rated voltage 42kV


Product Tags: transformer calibration platform , Fully automatic high-voltage three-phase combined transformer calibration station

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Verified Business License
Business Type
Manufacturer
Year Established
2014
Main Markets
Southeast Asia

Recommended Categories

Explore top categories and find suppliers for your specific needs