Home > Electrical & Electronics > Power Transmission & Transformer > Transformer > TKBZT-III-2500kVA Transformer Comprehensive Performance Test Bench

TKBZT-III-2500kVA Transformer Comprehensive Performance Test Bench

TKBZT-III-2500kVA Transformer Comprehensive Performance Test Bench photo-1
Negotiable MOQ: 1 Piece (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Brand Name:
GDMK
Place of Origin:
China
Model Number:
TKBZT-III-2500kVA
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
Delivery time depends on order quantity.
Brand Name GDMK
Place of Origin China
Model Number TKBZT-III-2500kVA

The TKBZT-III-2500KVA transformer comprehensive test system complies with relevant national standards such as GB1094, GB/T4776, GB/T5169 and so on. With the increase of power transmission and transformation projects and the continuous increase of power grids

, The country’s urban and rural power grids have been transformed successively, and the online number and capacity of power transformers have been increasing. Our company has independently developed and produced a high degree of automation, simple and fast operation, low failure rate and high integration

The integrated TKBZT-III-2500kVA transformer comprehensive performance test bench, the system is suitable for no-load test, load test, and transformation ratio test of distribution transformers with a voltage of 10KVA and a capacity of 2500kVA and below

Measurement, DC resistance measurement, power frequency withstand voltage test, and induction withstand voltage test in one unified integration, digitization, reducing mechanical failures and reading errors, while improving the accuracy of the overall test system

And applicability. Make the factory test easier and faster.

         The system has two operation modes (the two operation modes are interlocked, and can only work in one operation mode). The original button operation mode of the transformer integrated test bench is retained, and the microcomputer operation method is added.

This mode of operation only needs to click the mouse on the computer monitor to complete the test. All operations are executed by the PLC in the system starting its command execution unit to complete the test. In addition, the system is also configured

The video surveillance system monitors the test area, making it safer and more reliable. The system integrates test-one-time wiring, test control, monitoring, measurement, protection, display, data acquisition, analysis and processing,

Measurement control, storage, printing, and protection are integrated, and the entire test process is automatically completed. It has the outstanding advantages of high efficiency and high precision.


Product Tags: Transformer comprehensive test bench , Transformer test bench

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Verified Business License
Business Type
Manufacturer
Year Established
2014
Main Markets
Southeast Asia

Recommended Categories

Explore top categories and find suppliers for your specific needs