After the piping system is installed, it can be blown by air or steam according to the working conditions of the working medium and the degree of dirt on the inner surface of the pipe. The general requirements for pipe purge are:
Equipment and pipes that are not allowed to be purged should be isolated from the purging system.
Before the pipeline is purged, orifice plates, flange-connected regulating valves, main valves, throttle valves, safety valves, instruments, etc. should not be installed. For the above-mentioned valves and instruments connected by welding, the bypass should be used or the seal should be removed. Protective measures such as pieces.
The order of purging should be carried out in the order of main pipe, branch pipe, and drain pipe. The blown out dirt must not enter the pipe that has been purged.
The dirt discharged by purging shall not pollute the environment, and random discharge is strictly prohibited.
A restricted area should be set before purging.
After the pipeline has been purged qualified, other operations that affect the cleaning shall not be carried out.
Aluminum target plates for scanning experiments, specifications and models are customized according to customer needs, Zexu company specializes in producing aluminum target plates, with favorable prices and good quality.
1. After the strength test of the piping system, before the air pressure tightness test, purge and clean should be carried out in sections
2. The method of purging should be determined according to the requirements for the use of the pipeline, the working medium and the degree of stolen goods on the inner surface of the pipeline. The liquid or gas pipeline with a nominal diameter greater than or equal to 600mm should be manually cleaned. The liquid pipeline with a nominal diameter less than 600mm should be Use water to clean the gas pipeline with a nominal diameter of less than 600mm, which should be purged with air. Steam pipes should be purged with steam, and non-thermal pipes should not be purged with steam. The purge is generally carried out in sequence according to the main pipe, branch pipe, and drain pipe.
3. Before the pipeline is purged, a detailed purging plan should be prepared and carried out in sections according to the system
4. The equipment and pipes that are not allowed to be purged are separated from the purging system.
5. After the pipeline is qualified for purging, in addition to the prescribed inspection and restoration work, no other work affecting the cleaning of the pipeline shall be carried out, and the "Pipeline System Purging Record" shall be filled in
Send Inquiry to This Supplier
You May Also Like
-
320*30*5 Target Christmas Plates Target Plate Pipeline Purging DeviceNegotiableMOQ: 1 Piece
-
3003 Material Mirror Target Plate Hearth And Hand DinnerwareNegotiableMOQ: 1 Piece
-
Mirror Target Plate Target White Plates Pure Aluminium MaterialNegotiableMOQ: 1 Piece
-
Titanium Sputtering Target Hearth And Hand Plates 170*15*6NegotiableMOQ: 1 Piece
-
Target Kids Plates Purge Target Plate 170*15*6NegotiableMOQ: 1 Piece
-
1020*50*6 Target Plate High TemperatureNegotiableMOQ: 1 Piece
-
High Pressure Target Plate Target Kids Plates 450*50*8NegotiableMOQ: 1 Piece
-
Target White Plates Mirror Target Plate 630*30*5NegotiableMOQ: 1 Piece
-
Target Plate Pipeline Purging Device Machined According To Figure Target Melamine PlatesNegotiableMOQ: 1 Piece
-
Pure Aluminium Material Sputtering Target Price Hearth And Hand DinnerwareNegotiableMOQ: 1 Piece