Galvanized Split Set for Mine Support
Glavanized split set for mine support
The Split Set is a slotted steel tube,with one end tapered for easy insertion into a drill hole.The other end has a welded ring flange to hold the bearing plate.The stabilizer is inserted into a hole slightly smaller in diameter than the tube, using a simple driver tool fitted to the drill.As the tube enters, its diameter is compressed and the slot partially closes. This exerts radial forces along the length of contact with the rock, providing the friction which holds the rock together. The driving force of the drill actively loads the bearing plate against the rock
Mining and Ground Support:
Split Set friction rock stabilizers are used for underground or surface support in many applications:
Places Where Need Ground Support
Split Set Rock stabilizers are an easy solution to your ground support, mine roof support and other stabilizjuing, holding, or anchoring problems. They are cost effective and simple to install.
/split-set/
Send Inquiry to This Supplier
You May Also Like
-
Hot Rolled Steel Flat Bar for Crane RailUS$ 650 - 680MOQ: 25 Tons
-
Cold Drawn Steel BarUS$ 650 - 680MOQ: 25 Tons
-
Cold Drawn Steel Hexagon BarUS$ 650 - 680MOQ: 25 Tons
-
Cold Drawn Steel Round BarUS$ 650 - 680MOQ: 25 Tons
-
Full Thread Steel Bar for Rock BoltsUS$ 650 - 680MOQ: 25 Tons
-
Split Set for Mine SupportUS$ 650 - 680MOQ: 25 Tons
-
ASCE60 Steel RailUS$ 600 - 640MOQ: 5 Tons
-
American Standard ASCE25 Steel Rail SupplierUS$ 600 - 640MOQ: 5 Tons
-
ASCE30 Steel Rail Price in ChinaUS$ 600 - 640MOQ: 5 Tons
-
40LBS Steel Rail ASCE40 Steel Rail PriceUS$ 600 - 640MOQ: 5 Tons
