Antislip Plywood
If put in boiling water for 48 hours, it is still glue-sticking and non-deformed
Physical mood is better than iron moulds and can satisfy the requirements of constructing mould, the iron ones are easy to be deformed and can hardly recover its smoothness even after repairing
If used abide by the illustrations strictly, it can be reused more than 50 times,
Reducing the cost greatly and avoiding the disadvantages from ( rustily and erosive of iron mould)
Solves the problems of leaking and rough surface during constructing process
Particularly suitable for watering concrete project , can make the concrete surface smooth and flat
Realizing a higher economic profits.
Send Inquiry to This Supplier
You May Also Like
-
Permanent Formwork Steel Floor Decking for Concrete Floor SlabUS$ 510 - 535MOQ: 10 Tons
-
Construction Formwork Crusher Scrap Wooden Box Hammer CrusherUS$ 4500 - 25800MOQ: 1 Set
-
Building Plant Aluminum Formwork Cleaning Machine Cement Removal High Pressure Cleaning SystemUS$ 8000.00MOQ: 1 Set
-
High Ribbed Formwork/Fast Ribbed FormworkNegotiableMOQ: 20 Tons
-
Formwork CeilingUS$ 100 - 300MOQ: 10 Pieces
-
Formwork PlywoodUS$ 180 - 500MOQ: 50 Cubic Meters
-
Steel FormworkUS$ 1,000 - 500,000MOQ: 1 Set
-
Formwork Tie RodUS$ 1 - 10MOQ: 1000 Sets
-
Aluminium Formwork AccessoriesUS$ 2,800 - 3,600MOQ: 1 Ton
-
Peri System Formwork H20 Timber Beam and Wooden Formwork PanelUS$ 6.8 - 8.8MOQ: 1000 Meters