BW250 Triplex Mud Pump|Drilling Pump

BW250 Triplex Mud Pump|Drilling Pump photo-1
BW250 Triplex Mud Pump|Drilling Pump photo-2
BW250 Triplex Mud Pump|Drilling Pump photo-3
BW250 Triplex Mud Pump|Drilling Pump photo-4
US$ 3000.00 - 5000.00 MOQ: 1 Piece
Key Specifications
Get Latest Price
Brand Name:
zhongtuo
Place of Origin:
China
After-sales Service Provided:
Engineers available to service machinery overseas
Payment & Shipping
Payment Methods:
Port of Shipment:
shanghai
Delivery Detail:
5 days
Brand Name zhongtuo
Place of Origin China
After-sales Service Provided Engineers available to service machinery overseas
Warranty 1年
Weight 600KG
Certification SGS
Condition New

Description of BW250 Triplex Mud Pump|drilling pump


BW250 Triplex Mud Pump-00.jpg  BW250 Triplex Mud Pump-02.jpg   


BW250 Triplex Mud Pump-03




BW250 Triplex Mud Pump:

  1. Be sure that the pump foundation is level and able to support the weight of the pump.

2. Install the pump as close as possible to the mud tank or pit to reduce drop in suction line. 


SUCTION SYSTEM 

  1. The diameter of the suction line must be equal to or exceed the diameter of the pump suction connection.

  2. Use as short a suction line as possible.

 3. Install the suction line in as straight a line possible. If turns are necessary use long radius ells.  4. Install a section hose in the suction line to isolate vibration. 

 5. Be sure there are no air traps or air leaks in the suction line. 

 6. Install a charging pump in the suction line. (See CHARGING PUMPS.) 

 7. Install a suction desurger to prevent mud cavitation. (Refer to FLUID END ACCESSORIES in Section 4 of this guide.) 

 8. Fully open all valves in the suction line before operating the pump.




Tips for PREPARATION:

  1. If the pump was not completely assembled at the factory, complete the assembly as required.

 2. Check to be sure the suction and discharge systems have been properly installed. (SEE INSTALLATION) 

 3. Remove the cover plates from the power end. 

 4. Inspect the power end for contamination. Clean as required. 

 5. Drain all condensation from the power frame (Figure 1-4). Fig. 1-4 Power end drain plug Do not attempt to drain condensation from power frame if unit has been filled with lubricant. (why?) 

 6. Install cover plates. 

 7. Check that crankcase drain plug is installed and tight. 8. Fill the power end with correct lubricant.


Product Tags: BW250mud pump , BW250 mud pump well drilling , BW250 drilling mud pump

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer
Year Established
2015
Annual Export Value
US$1 Million - US$1.5 Million
Port of Shipment
shanghai, tianjin