Home > Construction & Decoration > Toilet & Accessories > Toilet > QPMX-50 Steel Rail Auto-climbing Formwork With One Oil Cylinder Unit Can Lift 50KN

QPMX-50 Steel Rail Auto-climbing Formwork With One Oil Cylinder Unit Can Lift 50KN

QPMX-50 Steel Rail Auto-climbing Formwork With One Oil Cylinder Unit Can Lift 50KN photo-1
Negotiable MOQ: 1 Piece (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Brand Name:
Yunhai
Place of Origin:
China
Model Number:
QPMX-50
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
7 days
Brand Name Yunhai
Place of Origin China
Model Number QPMX-50
Delivery Time:under negotiation
Certification:CE,ISO,FCC
QPMX-50 steel rail Auto-climbing formwork with One oil cylinder unit can lift 50KN 1. QPMX-50 Auto-climbing formwork
2. suitable for dam, high building ( 100 meters high)
3. One oil cylinder unit can lift 50KN

Introduction :

The lifting power of the Formwork QPMX-50 comes from its hydraulic system, which includes the oil cylinder and commutator. Through functioning of hydraulic system, the steel rail and bracket can climb up alternately, so the whole formwork system climbs steadily, independent of a crane. It\' s easy to operate, and climbing is fast and safe.

The Characteristics


1. One oil cylinder unit can lift 50KN.
2. The QPMX-50 system can climb not only vertically but also slantwise, and the forward or backward inclination can be up to 18 degrees.
3. The system can climb up wholly or separately. The climbing process is steady, synchronous and safe.
4 .The bracket does not come back to the ground until construction work is finished, and spacing for work is reduced while the bumping damage is almost completely prevented, especially for the plywood.
5.The error of structure construction is tiny and easy to correct.
6.The formwork can climb up by itself and cleaning work can be done in situ. The number of crane lifts are greatly reduced.

Standard Climbing Process


1.Set up the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete pouring.
2. Remove the formwork after the first pouring and fix anchor shoes on the finished wall, lift the brackets and formwork to the right position, match the formwork and do the second pouring.
3.Lift formwork and brackets to the higher floor; fix climbing rail and hydraulic system.
4.Match the formwork to the right position and do the third pouring.
5.Strip the formwork and fix anchor shoes on the finished wall, then let the climbing rails climb.
6. Brackets climb up to the right position, then install suspended platform.
7.Match the formwork, do the concrete pouring, and proceed into the standard climbing stage.

Illustration of Verticle Climbing

Sketches of inclined climbing

1 formwork panel H=4000mm m2
2 suspending scaffold   set
3 Diagonal bracing   set
4 threaded rod D15 m2
5 Flynt D15 Pc
6 Shim block D20 Pc
7 Shaft Platform Beam 2.1-2.7m set
8 Anchor cone (Climing cone) M30/D20 Pc
9 bolt M30X80 Pc
10 Mold Releasing agent   Litre
11 plate,steel pipe,Guardrail    
12 Screw and nut M16X120 set
13 Expension bolt M12X60 set

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Total Employees
101 - 200 People
Main Markets
North America, South America, Eastern Europe
Location
Zibo, Shandong, China

Recommended Categories

Explore top categories and find suppliers for your specific needs