Home > Construction & Decoration > Floors & Flooring > Engineered Wood Flooring > PJ240 Light Weight Flexible Climbing Formworks for Concrete Pouring of Piers

PJ240 Light Weight Flexible Climbing Formworks for Concrete Pouring of Piers

PJ240 Light Weight Flexible Climbing Formworks for Concrete Pouring of Piers photo-1
Negotiable MOQ: 1 Piece (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Brand Name:
Yunhai
Place of Origin:
China
Model Number:
PJ200 & PJ240
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
7 days
Brand Name Yunhai
Place of Origin China
Model Number PJ200 & PJ240
Delivery Time:5-28days
Certification:CE,ISO,FCC
 PJ240 light weight flexible Climbing Formworks for concrete pouring of piers 1. PJ200 & PJ240 Climbing Formwork
2. suitable for dam, high building ( 100 meters high)
3. can stick to the concrete tightly

Product Name:Climbing Formwork

Introduction:


The cantilever climbing formwork PJ200 & PJ240 are widely used in concrete pouring of piers, high-rise buildings, and a variety of other structures.
The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods. Therefore, additional reinforcement is not needed. The construction is easy, rapid and economical, and the surface of the concrete is slick.
The biggest advantage of PJ series is light in weight and convenient in use. The operation platform width of PJ200 and PJ240 is 200cm and 240cm respectively.


The Characteristics


The formwork unit can move backwards up to 600mm.
The formwork is flexible to adjust from all directions.
The inclination can be adjusted by pull-push prop and is up to 18°.
Reasonable structure and light weight.
High level of universality and standardization for connection components.

Structure Sketch

PJ200                                                                                                                                  PJ240

The Concrete Pouring Process

The first pouring
Before pouring, fix the anchor system on the plywood by M30 position bolt or construction bolt. Reinforce the formwork by wall- through tie rods.

The second pouring(the first lift)
Climbing brackets are used in the second pouring. Fix the anchor shoe in the bowl-climbing cone by tensile bolt, hang the bracket on the anchor shoe, and then insert the safe pin.

The third pouring(the second lift)
Fix suspended platform under the climbing bracket. Workers can remove the tensile bolt, anchor shoe and bowl-climbing cone for reusing, and then fill the holes left by bowl-climbing cone. This pouring process is the standard pouring; the later lifting process is the same, till the concrete pouring is finished.

1 formwork panel H=4000mm m2
2 suspending scaffold   set
3 Diagonal bracing   set
4 threaded rod D15 m2
5 Flynt D15 Pc
6 Shim block D20 Pc
7 Shaft Platform Beam 2.1-2.7m set
8 Anchor cone (Climing cone) M30/D20 Pc
9 bolt M30X80 Pc
10 Mold Releasing agent   Litre
11 plate,steel pipe,Guardrail    
12 Screw and nut M16X120 set
13 Expension bolt M12X60 set

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Total Employees
101 - 200 People
Main Markets
North America, South America, Eastern Europe
Location
Zibo, Shandong, China

Recommended Categories

Explore top categories and find suppliers for your specific needs