HOT!gold Grinding Machine for Gold Wash Plant
Gold grinding machine for gold wash plant
The Introduction of gold grinding machine for gold wash plant
Grinding gold machine/wet pan mill mainly used for choosing gold, silver, lead, zinc, iron, molybdenum, copper and antimony mine, etc.This machine is mainly though raw material repeated mixing, rolling, crushing, and rolling to reach equilibrium moisture, uniform ratio and low air content so as to improve the molding rate molding quality. The grinded products are with high density, good strength, high non porosity percentage. mainly used for choosing gold, silver, lead, zinc, iron, molybdenum, copper and antimony mine, etc.This machine is mainly though raw material repeated mixing, rolling, crushing, and rolling to reach equilibrium moisture, uniform ratio and low air content so as to improve the molding rate molding quality. The grinded products are with high density, good strength, high non porosity percentage.
The gold grinding machine for gold wash plant is named by the diameter of roller. Φ1300,Φ 1350,Φ 1400,Φ 1500,Φ 1600 is suitable for selection of iron ore, molybdenum ore ,lead ore ,zinc ore, antimony ore and so on. Φ 850, Φ 900, Φ 1000,Φ 1100,Φ 1200 is suitable for selection of gold ore. Above all, 1200a type is the most popular and widely use in the world especially in Sudan.
Working Principle of gold grinding machine for gold wash plant
1.Firstly the motor will transmit the motive power to reduction gears,under the drive of reduction gears that passing through large vertical spindle,then the power cabinet transfers to above whippletree.
2.The whippletree pulls the two runner wheels clockwise rotation,and runner wheels are not only revoluting around the large vertical spindle but also could retating by themselves.
3.After adding into ore,the materials are under the extrusion of grinding roller weight to revoluting and rotating with runner wheels,when twisting that coming into being huge friction force with grinding base,after suffering repeated extrusion,rub,grinding that be crushed thoroughly.
4.Under the effects of grinding roller operating,the crushed materials and the water mixed intensively to float on it uniformly,then passing through the overflow discharge gate that setting up on the mill basin,after that enter into next operation procedure to process.
5.Coarse mineral was sank on the bottom of grinding base,going on grinding and crushing,till the fineness could reach to standard.
Technical Parameters of 1200 Wet Pan Mill

Notes: The model is named according to the diameter. Diameter*Thickness*Width+20mm.
Structure of 1200 Wet Pan Mill
The new type 1200 wet pan mill has smoother apperance, and better workmanship
The Operation and Maintenace
1) The raw material should be put into the gold machine after the gold machine running normally.
2) The gold grinding machine for gold wash plant is not allowed to state with the material in the machine. If the machine is stopped because of stoppage, the residual material in the machine should be cleared. Then start the machine again.
3) The material should be put into the gold grinding machine uniformity, not sometimes much sometimes less. It's better to use a feeding equipment.
4) The bearing part should be add butter regularly.
5) Every bolts should be checked to avoid flexible.
6) The bearing should be changed in time if it is damaged to avoid damage other parts.
7) While the gold machine is running formally, you should check if there is abnormal sound in the reducer box and or bearing part, if there is a too high temperature, if there is too big motor current and so on. If it happened, you should stop the machine to remedy of the trouble.
8) The motor V-belt should be removed while examine and repair the machine for your safe.
Spare Parts of gold grinding machine
Our 1200 Wet Pan Mill to Sudan with CIQ working in Sudan

Packaging&Delivery
1)Gold grinding machine for a gold wash plant usually is packed by separate so that a 20"GP can load 5sets.
2) Inside package is plastic bag,outside package is wooden case,or as your request
Our Services and Company Information
The pre-sale service
Gongyi City Yuxiang Heavy Machinery Co.,Ltd professional technical team can provide you with the project and process design,and make purchase plan for you. or design and manufacture the products according to your special requirements.
The sale of services
Gongyi City Yuxiang Heavy Machinery Co.,Ltd professional sales staff will accompany you to complete the equipment inspection and acceptance, assists to draft the construction scheme and detailed process.
The after-sale service
Gongyi City Yuxiang Heavy Machinery Co.,Ltd sent technical personnel to the scene to guide the installation of equipment, commissioning machine and training of operator.
Our company have professional R&D team, excellent technical team, sales team and strong production capability, we have been devoting our self to the development and promotion of gold mining machinery and all our products have got CE certificates.
Q: How about the price?
A: We are manufactory, and we can give you lower price than those trade companies. Besides, customers from Alibaba can get a discount.
Q: Do you provide after-sale service?
A: Yes. The warranty period of our machines is one year, and we have a professional after-sale service team to promptly and thoroughly solve your problems.
Q: Do you provide equipment operation training?
A: Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training. All of our engineers have passports.
Send Inquiry to This Supplier
You May Also Like
-
Factory Supply 3R1510 Small Raymond Mill High Efficiency Mining Grinding EquipmentUS$ 3200 - 10000MOQ: 1 Set
-
HCM S95-grade Blast Furnace Slag Grinding Mill, Achieving a Fineness of 430 Specific Surface Area With a Production Capacity of 40 T/hNegotiableMOQ: 1 Combo
-
Ball Mill Jar With Capacity of 0.56-130TPH and ISO9001:2008 CertificateNegotiableMOQ: 1 Set
-
Mineral Gold Ore Copper Ore Complete Chrome Ore Processing Line for AlbaniaUS$ 10,000 - 1,000,000MOQ: 1 Set
-
Wet Pan Mill for Sudan Gold Mining Plant, Wet Pan Grinding Mill for SaleUS$ 3,000 - 15,000MOQ: 1 Set
-
Professional Coal Grinding MachineUS$ 1,900 - 3,500MOQ: 1 Piece
-
KMJ02-05 Stone Grinding Ball MachineNegotiableMOQ: 1 Unit
-
Zirconia Ball Mill Grinding MediaUS$ 5,000 - 60,000MOQ: 1 Set
-
2016 New Type Top Quality Impact Stone Crusher Machine for SaleUS$ 1,000 - 1,000MOQ: 1 Set
-
Vertical Roller MillUS$ 40,000 - 150,000MOQ: 1 Set











