Wet Grinding Machine, Edge Gumming Runner Wet Mill
wet pan mill for gold brief introduction:
Wet grinder gold machine also named wet pan mill, is mainly used for separation of gold, silver, lead, zinc, molybdenum, iron, copper, antimony, tungsten, tin and other minerals selected. With less investment, fast results, small footprint, saving power, sturdiness and durability, ease of maintenance and high return on investment. It is the preferred production for alternative ball mill, is ideal for small and medium enterprises dressing.
We use thicken plate on the water tank and improves gear box. The casting parts is joint by small pieces, even without large lifting device, it can finish parts change, this helps to decrease operation cost.
Working Process of wet pan mill
1.Firstly the motor will transmit the motive power to reduction gears,under the drive of reduction gears that passing through large vertical spindle,then the power cabient transfers to above whippletree.
2.The whippletree pulls the two runner wheels clcokwise rotation,runner wheels are not only revoluting around the large vertical spindle but also could retating by themselves.
3.After adding into ore,the materials are under the extrusion of grinding roller weight to revoluting and rotating with runner wheels,when twisting that coming into being huge friction force with grinding base,after suffering repeated extrusion,rub,grinding that be crushed thoroughly.
4.Under the effection of grinding roller operating,the crushed materials and the water mixed intensively to float on it uniformly,then passing through the overflow discharge gate that setting up on the mill basin to discharge,after that enter into next operation procedure to process.
5.Coarse mineral was sank on the bottom of grinding base,going on grinding and crushing,till the fineness could reach to standard floating on it.
The thchnical parameters
| Model | specification |
Input size (mm) |
Process ability (t/h) |
Speed (r/min) |
Motor (kw) |
Weight (t) |
| 1600 | 1600×400×±20 |
less than 30 mm |
4 | 20—22 | 6—30 | 17 |
| 1500A | 1500×400×±20 | 3 | 20—22 | 6—22 | 15 | |
| 1500B | 1500×350×±20 | 2.5—3 | 20—22 | 6—22 | 14 | |
| 1500C | 1500×300×±20 | 2—2.5 | 20—22 | 6—22 | 12.5 | |
| 1400 | 1400×250×±20 | 1.5—2 | 16—18 | 6—18.5 | 9.5 | |
| 1300 | 1300×250×±20 | 1.5 | 21—23 | 6—15 | 7.8 | |
| 1200A | 1200×220×±20 | 0.9—1.2 | 16—18 | 4—7.5 | 6.0 | |
| 1200B | 1200×200×±20 | 0.8—1 | 21—23 | 4—7.5 | 5.8 | |
| 1100 | 1100×200×±10 | 0.6—0.8 | 16—18 | 4—5.5 | 5.5 | |
| 1000 | 1000×200×±10 | 0.5 | 21—23 | 4—5.5 | 4.5 | |
| 900 | 900×150×±10 | 0.3 | 17—19 | 3 |
3.2 |

Wet pan mill Application
Wet pan mill used with gold, silver, lead, zinc, iron, molybdenum, copper, antimony mine, mine, all ball mill can be selected grind gold machine can be used. It grinds gold through the raw material mixing, rolling, crushing, rolling repeatedly reach moisture equilibrium ratio of uniform, low gas content, improve the forming rate and forming quality, grind the material through the machine molding Products with high density, good strength, no porosity ratio weight. Energy efficient, high volume of output, the product is used for iron ore process tailings recovery, not to slag the loss of effective resources can be fully utilized.
Three roller wheel wet pan mill
The operation and maintenance:
1) The raw material should be put into the machine after the machine running normally.
2) This machine is not allowed to state with the material in the machine. If the machine is stopped because of stoppage, the residual material in the machine should be cleared. Then start the machine again.
3) The material should be put into the machine uniformity, not sometimes much sometimes less. It's better to use a feeding equipment.
4) The bearing part should be add butter regularly.
5) Every bolts should be checked to avoid flexible.
6) The bearing should be changed in time if it is damaged to avoid damage other parts.
7) While the machine is running formally, you should check if there is abnormal sound in the reducer box and or bearing part, if there is a too high temperature, if there is too big motor current and so on. If it happened, you should stop the machine to remedy of the trouble.
8) The motor V-belt should be removed while examine and repair the machine for your safe.
our technical engineer will privod technical services in a year.
certification
1. Are you a trading company or a manufacturer?
We are a manufacturer.
2. How can I get to your company?
You can get a flight to Zhengzhou Xinzheng International Airport . and we can go to airport to pick you up directly.
All our clients from home or abroad, are warmly welcome to visit our factory and inspect our products!
3. How long is your guarantee?
One year(Calculated from the equipment arrives the customer’s side.). After this period we will definitely support
you when needed. You will be welcome to contact us with any problem may happened.
4. Will you send engineers to install the plant?
yes, but at an extra cost payable by the customer. Or you can get local contractors to do thecommissioning and we send one supervising engineer.
Send Inquiry to This Supplier
You May Also Like
-
Raymond Grinding Mill Roller Mill Grinder Machine Stone Ore Grinding Milling Machine For Gypsum Quartz Powder ProcessingNegotiableMOQ: 1 Set
-
Ball Mill With VFD Speed Adjustment for Ore VariabilityUS$ 2000MOQ: 1 Combo
-
Low Maintenance Cost China Raymond Mill, Versatile Raymond Roller Mill For Various Non-Metallic OresNegotiableMOQ: 1 Combo
-
Mining MillNegotiableMOQ: 2600 Sets
-
Ball Mill Jar With Capacity of 0.56-130TPH and ISO9001:2008 CertificateNegotiableMOQ: 1 Set
-
Mineral Gold Ore Copper Ore Complete Chrome Ore Processing Line for AlbaniaUS$ 10,000 - 1,000,000MOQ: 1 Set
-
Wet Pan Mill for Sudan Gold Mining Plant, Wet Pan Grinding Mill for SaleUS$ 3,000 - 15,000MOQ: 1 Set
-
Professional Coal Grinding MachineUS$ 1,900 - 3,500MOQ: 1 Piece
-
KMJ02-05 Stone Grinding Ball MachineNegotiableMOQ: 1 Unit
-
Zirconia Ball Mill Grinding MediaUS$ 5,000 - 60,000MOQ: 1 Set