Cellular Light Weight Block Machine

Cellular Light Weight Block Machine photo-1
US$ 500,000 - 900,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Condition:
New
Type:
Other, aac production line
Brick Raw Material:
Concrete
Payment & Shipping
Payment Methods:
Port of Shipment:
qingdao
Delivery Detail:
Delivery time depends on order quantity.
Condition New
Type Other, aac production line
Brick Raw Material Concrete
Processing Brick Production Line
Method Autoclaved Aerated Concrete
Automatic Yes
Capacity 50000/100000/150000/200000/250000/300000CM/year
Place of Origin Shandong, China
Brand Name dongyue
Model Number aac production line
Voltage clients industrial voltage
Power NA
Dimension(L*W*H) NA
Certification ISO,CE,SGS
Warranty ONE YEAR
After-sales Service Provided Engineers available to service machinery overseas

Specifications

AAC Block Making Plant
1.Germany Technology Japan system
2.sand or fly ash
3.Siemens,ABB motors
4.ISO,CE,SGS

AAC Block Making Plant

 

 

 

1.Dongyue Machinery Group is a company specialized in producing AAC BLOCK MACHINE,AAC PANEL MAKING MACHINE,The capacity is between 50000m3 to 300000m3 per year.

 

With technology cooperation with Germany company AAC CONCEPT,Our aac block machine inherits germany technology.So far we have 15 line of AAC block machine in Indonesia,14 lines in india,5 lines in Vietnam,2 lines in Buma,2 lines in Mongolia ,1 line in Kazakhstan ,1 one in Bulgaria


 

 

 

 

 

 

 

2.What is AAC?

 

 

AAC is a kind of light cellular silicate products. Main material based on Silicon materials ( sand, fly ash,gangue contains silicon)and Calcium(cement and lime),mix with foaming agent (Aluminium powder), after batching, mixing, pouring,pre-curing,cutting,stream(autocaled),and other process ,finally, get this light weight concrete products..          

 

 3.AAC autoclave machine raw material introduction

 

 Fly-Ash: It is freely available in Thermal Power plants. There are no taxes on this item whatsoever. Transportation charges are only to be attended by the entrepreneur.   

 

 Sand:   Except fly ash,Sand can be the main material too.The requests is that the Silica content is above 69% .

 

Lime:     Active powered lime is a requirement for giving the real aeration to the product. In phase 1 we can aim to buy the active lime directly. In phase -2 we can think of having backward integration and making a lime powering unit at site to have a more competitive advantage, We can also think of a lime  burning klin inside the factory premises.   The project financials however have not considered  the costs of powering unit, and the lime kiln in this project.     Different qualities of lime are available, and depending on the raw materials, the mix design can be chosen to get the optimal quality of production.  

 

OPC cement.    This Project aims to utilize OPC cement as main binder material. It will give faster strength to the bricks, besides giving  improved consistent quality. It also ensures a better cost effectiveness for the same. Using OPC will be a standardized practice. The other prime advantages of using OPC (compared to other binders) is it’s easy availability locally through nationwide Retail Network of Cement Companies.   

  

Gypsum:     This too is an industrial waste. This is available as an industrial byproduct of Fertilizer Plant. Gypsum is responsible to give long term strength to the Blocks.      

  

Aluminum Power.     Finely ground Aluminum power is used in very limited quantity ( less than 0.5%), so that it reacts with active lime, and silica in base material to make the aeration,

 

 

 

Name

Unite

fly ash AAC

Fly ash

%

65-70

Cement

%

6-15

Lime

%

18-25

Gypsum

%

3-5

Aluminum powder paste(600kg/m3)

1/10000

8

Water & material rate

 

0.6.-0.65

Casting system

°C

36-40

Aluminum mixing time

S

30-40

 

 

cement lime sand style aerated block raw material proportion

 

 

Name

Unit

sand  AAC

Sand

%

55-65

Cement

%

10-20

Lime

%

20-30

Gypsum

%

2-3

Aluminum powder paste(600kg/m3)

1/10000

8

Water & material rate

 

0.65-0.75

Casting system

°C

35-38

Aluminum mixing time

S

30-40

 

 

 

4.AAC autoclave machine process

 

 The Process of manufacture is simple t follow, and complex to implement. 

 

First, the Fly Ash is mixed with water, and made Slurry in a slurry mixture. If Sand is used as a base material, we need a ball mill to grind the sand to fine power. The slurry making process is same sand.  

cellular light weight block machine 

 

 

cellular light weight block machine

 

 

 

After Slurry is made, the slurry is stored in slurry storage tank, where the slurry is constantly agitated. Care is taken to run the slurry storage tank all the time, so that is never settles down the particles. 

 

 

cellular light weight block machine

 

Then a weigh batcher weighs the Slurry, lime, OPC, Gypsum and aluminum power in preset quantities, and mixes thoroughly. The mixture also pours the mix into the Mould carried n the mould cart. The full pouring of the mixture is just enough to fill around 50% of the mould.   

 

  cellular light weight block machine

 

Then the mould is kept in a warm chamber for 2 hours, so that the aeration and the light initial setting takes place.    Next process is de-molding process of the big block, in which a sophisticated overhead hoist takes the mould, demoulds the block.   

 


Next process is the level wire cutting of the Block, while the block passes on the cutting trolley through the series of wires. This process follows a vertical wire cutting where as the block remains stationary, and the cutter cuts the block vertically.    

cellular light weight block machine

 

  cellular light weight block machine

 

The final cut blocks are Steam cured in autoclaves for 8 hours at 12 KG/Sq cm pressure, and 200D C

cellular light weight block machine

 

cellular light weight block machine

 

 

 

 

4.AAC autoclave machine prepartion work

 

 

 

1. Land of 4 Acres is Required

 2. Workshop area –approximately 30000 Sq Mt or 30000 sft

3. Total Plant area( construction area ) = 4500 Sq Mt or 45000 sft

4. Power connection needed – 500 KVA

 5. Ideal manpower requirement is 40 nos. (Skilled – 10, semi skilled-10 and unskilled 20)

 6. Skill division 40 workers = Main plant 2 nos of 10 hour shifts 15 people each + Boiler & Autoclave section 3 people in 3 shifts of 8 hours

 7. Water requirement approximately 225 Tons per Day.

 8. Fly Ash requirement approximately 225 Tons per day

 

 5.AAC blocks construction application :

 cellular light weight block machine

Why Choose us?

 

Rich experience:
We have exported more than 30 lines to different countries -- India( 14 lines),Russia,Indonesia(15 lines),Mongolia,Burma,Vietnam(5 lines), Middle East and so on.
 
Perfect after service:
Up to now,we already have office in India, Vietnam,Indonesia.
We can supply our customer for designning, production, installation, commissioning, training and perfect after-sale service.
 
Reliability:
We are the top leader in China on manufacturing the Autoclaved Aerated Concrete Line(AAC) with 65% market share. We are the only company which has been admitted as China well-know trademark by China Government in AAC block machine industry.
 
Competitive price:
We always produce good quality products with competitive price.
 

 

 Welcome you inquiry!

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2004
Factory Size
50,000-100,000 square meters
Total Employees
501 - 1000 People