Precipitation Filtration Equipment

Precipitation Filtration Equipment photo-1
Precipitation Filtration Equipment photo-2
Precipitation Filtration Equipment photo-3
Precipitation Filtration Equipment photo-4
Precipitation Filtration Equipment photo-5
Precipitation Filtration Equipment photo-6
US$ 8000.00 - 8000.00 MOQ: 1 Set
Key Specifications
Get Latest Price
Place of Origin:
Shandong, China
Brand Name:
EPO
Model Number:
YMCD
Payment & Shipping
Payment Methods:
Port of Shipment:
QINGDAO
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Shandong, China
Brand Name EPO
Model Number YMCD

1, Summary:

Inclined tube sedimentation tank refers to the precipitation area is equipped with the inclined tube sedimentation tank. Assembly form has two kinds of inclined pipe and branch pipe. In flat flow or vertical sedimentation basin precipitation area using inclined parallel tube or parallel pipeline divided into a series of precipitation of shallow layer, by processing and settlement of slime mutual movement in the precipitation of shallow and separation.

2, Detailed description:

Straight for us assist precipitator tank flocculation equipment sewage treatment equipment

 Precipitation filtration equipment
Precipitation filtration equipment

1. design flow 

   The design of the tank flow and grit chamber design flow is the same. At the confluence of the sewage treatment system, when the wastewater is themselves go into the tank, should according to the maximum flow as the design flow; When using water pump improvement, should be the biggest combination according to the water pump flow as the design flow. Should be according to the rainfall in the system of the confluence system design flow, but the settling time should be not less than 30 min.

2, sedimentation tank only

The urban sewage plant of settling basin, only the number should be not less than 2 only.

3. The experience of the sedimentation tank design parameters

   For urban sewage treatment plants, such as no sewage sedimentation performance of the measured data, but reference parameters using experience.

4. The effective depth of sedimentation tank, settling time, and the relationship of the surface of hydraulic load, general reference to the design specification. 

5. Settling basin geometry size

    Tank ultra-high not less than 0.3 m; Buffer layer using 0.3 0.5 m; Storage bucket the Angle of inclined wall, side should not be less than 60 DHS, round pipe should not be less than 55 DHS; Dredge pipe diameter should not less than 200 mm.

 6. Tank water

    

Generally adopts the weir flow, the weir crest level. The water weir load for: on the pond, at the beginning of should be no greater than 2.9 Us m.; For the secondary sedimentation tank, generally take 1.5 ~ 2.9 L/s m.. Sometimes can also be arranged more tank water, in order to improve water quality.

 

7. Storage bucket volume

Generally is calculated based on sludge quantity is not more than 2. For the secondary sedimentation tank, according to the mud storage time less than 2 hour meter.

8. Mud

Settling basin generally adopt hydrostatic pressure mud, hydrostatic pressure numerical value is as follows: primary sedimentation tank should be not less than 14.71 kPa (1.5 mH20); Activated sludge process of the second pond should be not less than 8.83 kPa (0.9 mH20); Biological membrane method of the second pond should be not less than 11.77 kPa (1.2 mH20).
Precipitation filtration equipment
Precipitation filtration equipment

Precipitation filtration equipment

Precipitation filtration equipment

Precipitation filtration equipment

Precipitation filtration equipment

Send Inquiry to This Supplier

Message
0/5000
Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2003
Factory Size
3,000-5,000 square meters
Total Employees
51 - 100 People

Recommended Categories

Explore top categories and find suppliers for your specific needs