200 Tons Chrome Recovery Plant Process

200 Tons Chrome Recovery Plant Process photo-1
US$ 5,000 - 9,999 MOQ: 1 Set
Key Specifications
Get Latest Price
Place of Origin:
Jiangxi, China
Brand Name:
JXSC gold washing trommel
Model Number:
400-2100
Payment & Shipping
Payment Methods:
Port of Shipment:
XIAMEN/SHENZHEN/GUANGZHOU
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Jiangxi, China
Brand Name JXSC gold washing trommel
Model Number 400-2100
Condition New
After-sales Service Provided Engineers available to service machinery overseas

200 tons chrome recovery plant process

 

200 tons chrome recovery plant process

 
Product Description

 

chrome recovery plant process  Applications

 

1. we design it to washing alluvial gold gravel, clay and sand, 
2.it normaly use in gold sand wash plant, placer gold concentrate plant, alluvial gold washing plant, river gold mining plant

3.It can input feeding size up to 230mm. processing capacity upto 200tons per hour

4. popular used in South Africa, Sudan, Ghana, South Amercia alluvial mining plant

 

chrome recovery plant process  Features

 

1. High capacity and high power scrubbing, large capacity can reach 200-220tons per hour

2. The long drum of the scrubber retains material for longer, more vigorous washing for complete separation

3. One high output electrical motor driving a gear system providing efficient torque

4. Adjustable rotary speed

5. The water with high pressure flushed the inwall of drum

6. Can accept material up to 230mm

7. Mechanical sealing of inlet chute – minimal spillage when over feeding

8. Drive loads absorbed within the drive frame and pivoting drive frame design – Foundations only have to support vertical load and are not critical for alignment ie minimal cost

9. Shell design less mass than conventional roller supported units – installation craneage requirement reduced 

 

 

chrome separator Working Principle

 

A: The rotary gold washing trommel  is an autogenously rotating drum scrubber, utilising pebbles and rocks within the feed source to fracture and disintegrate clays, agglomerates and soft oxides.

 

B: Disintegrated material is homogeneously slurried within the drum, whilst the autogenous load is retained within the drum by reverse flights located at the drum discharge end.

 

C: Slurry and washed oversize overflows the drum discharge throat to the concentric exit trommels.

 

D. this gold trommel is widely used in placer gold mining plant with sticky clay raw ore .

 

 

 
FAQ

1. What mineral are you separating?

 

2. What's the maximum size of raw material?

 

3. What's the size range of the mineral?

 

4. What's the capacity do you need per hour?

 

Could you pls confirm the aboved questions so that we can design the suitable flowchart for you? 

 

 
Our Services

1. do testing for gold ore,  tin ore , iron ore, tungsten processing in laboratory

2. design the mineral processing flow chart. design the layout of machines in mining plant

3. provide installation & operation video for mining plant

4. our engineer can go to customer minesite for installation, running test and training staff overseas

5. provide full solution for the complete gold wash plant

6. provide 12 month gurantee and spare parts available.

 

200 tons chrome recovery plant process

 

 

 we provide OEM service. we can produce the machine according to your design and drawing. 

 

 

 

please find following are some further detail pictures of the gold washing trommel 

 

 

 

Screen material can made as your need or we will give you suggestion based on your mining conditions.

 

 

 

200tons capacity Gold Washing trommel / Gold Trommel Scrubber 

 

 

 200 tons chrome recovery plant process

 200 tons chrome recovery plant process

  

Company Information

 

  1. TUV, CE, SGS certificate

 

our factory has been producing mining machine for 29 years. we are very professional, and our machines are recongized by TUV, CE, SGS certificate insitute.  

 

 

 

2. gold washing machine customers visiting our factory,

 

our machines sell around the world, main market is Africa, Asia and South America. involved in gold washing plant, iron processing plant, tin processing plant, tungsten mining plant. ect. 

 

200 tons chrome recovery plant process

  

 

 

Welcome to 30 Years manufacturer JXSC

-- our experienced engineer can design flowchart according to your mine conditions: 

 

 

200 tons chrome recovery plant process 

 

 

 

If you have any interesting of our various Laboratory mining machines, pls feel free to contact with me, you are also very much welcomed to visit our factory which located in Shicheng country, Ganzhou city! 

 

 

Whatsapp: +86 18172711202

MOB:+86 18172711202

 

 

 

 

 

 

 

 

 

 

 

  

 

Send Inquiry to This Supplier

Message
0/5000
Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2014
Factory Size
1,000-3,000 square meters
Total Employees
101 - 200 People