YoungHead 2.4G High Power 500mW Outdoor Wireless Acess Point YH-WBS10-2R2-D
YoungHead 2.4G High Power 500mW Outdoor Wireless Acess Point
YH-WBS10-2R2-D
YH-WBS10-2R2-D is an carrier-class wireless Acess Point device(iEEE802.11A/B/G/N), including 2.4GHz and dual-band(2.4GHz&5.8GHz) , which based on Qualcomm Atheros platform, and accorded with industrial standards. Its protection level up to IP67, can normally work under the harsh outdoor environment; it support long distance(3.7km) communication when working with our wireless CPE device, and cloud management and control system; besides, our device can solve the problem of hidden nodes and greatly improve the download speed through Xspeed core technology.
This main functions of the WiFi device is supporting long distance communication and wide cover. For example: Broadband wireless access in countryside, scenic area, station/dock/airport/park/commercial plaza, industry zone/dormitory/school; Network bridge and so on. Base on the current network and this wifi device, the new users can access internet quickly.
Features:
- high speed rate up to 300M
- 2.4GHz frequency band
- support 16 SSID work at the same time
- support 30pcs wireless CPE device acess at the same time
- support more than 100pcs mobile or PC acess
- long distance, more than 3km
- support trestset
- waterproof IP67 and anti-thunder
Parameter:
| Item | Parameter |
| Frequency | 2.400~2.483GHz |
Transmitted Power | 27dBm(can chose) |
| Standard | IEEE 802.11 B/g/n |
| Distance | more than 3km |
| Speed rate | 300Mbps |
| Antenna | external antenna |
| Port | 1xWAN(10M/100M/1000M)RJ45,1xReset,1 Console |
| LED | 1xPower, 2xWLAN, 1xWAN, 1xStatus |
| Power | 48v (iEEE802.at)) |
Operating Temperature | -40℃~70℃ |
Operating Humidity | 0%~100%RH(None condensation) |
Power Dissipation | <20W |
Weight | 1.9kg |
| Size | 265mm×265mm×74mm |
Protection Standards | IP67; Anti-thunder class:GB/T 17626.5 |
Product Pictures
Our service:
---Your inquiry will be replied in 24hours
---Well-trained and experienced staffs to answer all your inquires in fluent English
---OEM&ODM, for any of your customized products we can help you to design and put into product
---Monthly output over 10,000 pcs
---All our products with 24months guarantee
About sample:
---Sample is available.
---Sample lead time: 2-3 working days, 4-5 days with customized logo
---More details, please contact with us.
Payment methods:
---T/T, Western Union, Paypal.
---30% deposit, balanced before shipment.
Shipping & Trade terms:
---By sea, air, or UPS, FEDEX, EMS, DHL, etc.
---Payment:T/T, Western Union, Paypal.
---Delivered time: 2-3 business days for sample, 20-25 days for mass order.
Contact Us:
---Name: Judy Lv
---Skype: vivian.vivian70
---Mobile: +86 13430531099
---QQ: 1047878112
Send Inquiry to This Supplier
You May Also Like
-
TYT Smarthome Gateway / Home Applainces Remote Comtroller in Zigbee Coordinator SystemUS$ 59 - 139MOQ: 1 Square Inch
-
Serial Wifi Module Wire Ethernet PCB Antenna Transparent Transmission WF-01US$ 1 - 10MOQ: 10 Pieces
-
Bulk Sms Gprs Gsm AT Command Sim5216 8 Ports Modem Pool 3g Modem ModuleUS$ 440 - 550MOQ: 1 Unit
-
RF DIN 7/16 Attenuator 50W 3dB/6dB/10dB/20dB/30dB/40dB/50dBNegotiableMOQ: 1 Piece
-
2015 New Design Bluetooth Transmitter for Smart TV ,home Audio SystemUS$ 11 - 13MOQ: 1000 Pieces
-
SIM800W for SIMCON GSM/GPRS ModuleUS$ 0.1 - 1MOQ: 1 Piece
-
Factory Price Good Performance 2.4g Wifi Internal Pcb Patch Antenna With 3M GlueUS$ 0.48 - 0.7MOQ: 100 Pieces
-
Wireless Serial 4 Pin Bluetooth Transceiver Module RS232 To Wifi Bluetooth ModuleUS$ 1 - 100MOQ: 100 Units
-
Round 3 Way Splitter Electric Log Splitter VK11093US$ 0.1 - 0.99MOQ: 5000 Pieces
-
High Strength FRP RadomeNegotiableMOQ: 100 Pieces







