Underground Oil Tank Double-layer Gap Anti-leakage Lining, Gas Station Oil Storage Tank Renovation
Underground oil tank lining renovation for gas stations. Manufacturer of fiberglass lining construction for oil storage tanks. Underground oil tank lining renovation, FF double-wall oil tanks, underground oil tank anti-corrosion. Anti-leakage renovation for buried oil tanks. Currently, the main methods for double-wall tank renovation in China are SF and FF tanks. Since it involves earthwork construction, the renovation time is about 30 days. Moreover, for densely populated areas and city centers, excavating and replacing tanks can easily cause safety hazards. Yike Company's double-layer anti-leakage lining technology can complete the double-wall tank renovation without excavation, and the renovation time is about 15 days, which has relatively greater advantages compared with SF and FF tanks.
Technical standards adopted: 1. International and domestic advanced technologies should be adopted. The technology should comply with the national standard GB/T30040.7-2013 "Double-wall tank leakage detection system - Part 7: General requirements and test methods for double-layer gap anti-leakage linings and anti-leakage jackets", and the latest version of the "Code for design and construction of automobile refueling and gas filling stations" GB50156. It is widely used worldwide and has excellent performance and reputation. 2. The part related to the performance indicators and testing of fiberglass in the "Steel - fiberglass reinforced plastic double-wall buried oil storage tanks" (JC/T2286-2014). 3. The part related to the performance indicators and testing of fiberglass in the "Engineering technical specification for buried fiberglass reinforced plastic double-wall oil tanks for gas stations" (SHT 3177-2015).
Send Inquiry to This Supplier
You May Also Like
-
Manufacturer for the Renovation and Construction of Double - Layer Linings for Underground Oil Tanks in Gas StationsUS$ 6153.85 - 7692.31MOQ: 1 Piece
-
Underground Steel Oil Tank Double - Layer Lining Renovation With Short Construction PeriodUS$ 923.08 - 1076.92MOQ: 1 Piece
-
Lining Renovation of Steel Oil Tanks in Gas Stations, Certified by National StandardsUS$ 923.08 - 1076.92MOQ: 1 Piece
-
Sewage Treatment - 50-ton Fiberglass Storage Tank, Yike, National Standard QualityUS$ 4615.38 - 6153.85MOQ: 1 Piece
-
Anti - Corrosion Transformation of Fiberglass Lining for Underground Oil Storage TanksUS$ 6153.85 - 7692.31MOQ: 1 Set
-
Anti - Corrosion Renovation Construction of Underground Oil Tank Lining in Gas StationsUS$ 6153.85 - 7692.31MOQ: 1 Piece
-
Manufacturer of Double - Layer Lining Reconstruction for Underground Oil Tanks in Gas Stations - YikeUS$ 7692.31MOQ: 1 Piece
-
Frp Anti - Corrosion and Anti - Leakage Lining for Cement Pools in Chemical PlantsUS$ 29.23 - 46.15MOQ: 100 Cubic Meters
-
Underground Steel Oil Tanks in Gas Stations: Lining Double-layer Anti-leakage Construction and RenovationUS$ 4615.38 - 6153.85MOQ: 1 Unit
-
Desulfurization Tower Frp Spray Layer Renovation, Frp Spray Pipes, Oxidation Air Pipes, YikeUS$ 1230.77 - 1538.46MOQ: 1 Unit

