Construction Price of Fiberglass Lining for Oil Storage Tanks. Anti-leakage Renovation of Buried Oil Tanks
Underground oil tank lining renovation, manufacturer of FRP lining construction for oil storage tanks, underground oil tank lining renovation, FF double-wall oil tank, underground oil tank anti-corrosion, anti-leakage renovation of buried oil tanks
Currently, SF and FF tanks are mainly used for double-wall tank renovation in China. Due to the need for earthwork construction, the renovation time is about 30 days. Moreover, in densely populated areas and city centers, excavating and replacing tanks can easily cause safety hazards. However, the double-wall anti-leakage lining technology of Yike Company can complete the double-wall tank renovation without excavation, and the renovation time is about 15 days, which has relatively greater advantages compared with SF and FF tanks.
Technical features and advantages of the underground oil tank lining renovation system for gas stations:
There is no need to move the existing oil tank. It can be manufactured and installed in the steel tank in use without damaging the surrounding area and equipment; 2. The on-site fabricated FF-type double-wall tank has a complete double-wall and interlayer structure;
3. The newly formed FF-type double-wall tank provides continuous leakage detection between the new inner and outer walls;
4. All performance indicators are consistent with those of the finished FF-type double-wall tank;
5. It can be applied to all known oil products, including alcohol-containing oil products;
6. It meets the requirements of relevant national standards, industry standards and environmental protection regulations.
Send Inquiry to This Supplier
You May Also Like
-
Underground Steel Oil Tank Double - Layer Lining Renovation With Short Construction PeriodUS$ 923.08 - 1076.92MOQ: 1 Piece
-
Lining Renovation of Steel Oil Tanks in Gas Stations, Certified by National StandardsUS$ 923.08 - 1076.92MOQ: 1 Piece
-
Sewage Treatment - 50-ton Fiberglass Storage Tank, Yike, National Standard QualityUS$ 4615.38 - 6153.85MOQ: 1 Piece
-
Anti - Corrosion Transformation of Fiberglass Lining for Underground Oil Storage TanksUS$ 6153.85 - 7692.31MOQ: 1 Set
-
Anti - Corrosion Renovation Construction of Underground Oil Tank Lining in Gas StationsUS$ 6153.85 - 7692.31MOQ: 1 Piece
-
Manufacturer of Double - Layer Lining Reconstruction for Underground Oil Tanks in Gas Stations - YikeUS$ 7692.31MOQ: 1 Piece
-
Frp Anti - Corrosion and Anti - Leakage Lining for Cement Pools in Chemical PlantsUS$ 29.23 - 46.15MOQ: 100 Cubic Meters
-
Underground Steel Oil Tanks in Gas Stations: Lining Double-layer Anti-leakage Construction and RenovationUS$ 4615.38 - 6153.85MOQ: 1 Unit
-
Desulfurization Tower Frp Spray Layer Renovation, Frp Spray Pipes, Oxidation Air Pipes, YikeUS$ 1230.77 - 1538.46MOQ: 1 Unit
-
Construction of Fiberglass Lining Renovation for Underground Steel Oil Tanks in Gas StationsUS$ 1461.54 - 1538.46MOQ: 1 Piece


