Rubber Weir Replacement System, Inflatable Dam for River Flow Regulation and Water Conservation
Hengshui Haogu Engineering Materials Co., Ltd., established in 2005 with ISO9001 and QS9000 certifications, specializes in manufacturing premium Rubber Weir Replacement Systems for global water management projects. Our inflatable dams deliver precise river flow regulation while significantly reducing water loss through evaporation compared to traditional concrete structures.
Engineered for durability in harsh environments, these systems feature:
- Multi-layer reinforcement with synthetic fiber cord and rubber compound
- Corrosion-resistant steel anchoring components
- Modular design allowing flexible installation across channels up to 100m wide
Technical specifications include:
| Parameter | Range |
|---|---|
| Working Height | 0.5-5m (standard) |
| Operational Temperature | -30°C to +70°C |
| Design Life | 25+ years |
Performance Advantages:
- Reduces installation time by 60% versus concrete alternatives
- Maintains precise water level control (±2cm accuracy)
- Emergency deflation capability within 15 minutes during floods
With over 15 years of engineering expertise and exports to 50+ countries including North America and Southeast Asia, our 3,000-5,000 sqm factory delivers US$5-10 million annual exports. Each unit undergoes 7-stage quality checks before shipment from major Chinese ports.
FAQ Section:
Q: What maintenance does the rubber weir require?
A: Annual inspection of rubber surfaces and quarterly checks of inflation systems are recommended. No specialized tools required.
Q: Can it withstand debris impact?
A: Yes, the 12mm-thick rubber composite resists abrasion from common river debris. Optional protective barriers available.
Q: How long does installation take?
A: Typical projects require 2-4 weeks depending on site conditions. Our engineers provide installation supervision.
Q: Are custom lengths available?
A: Yes, we manufacture units up to 100m in length with intermediate piers for wider channels.
Q: What inflation systems are used?
A: Standard models use electric blowers. Solar-powered and hydraulic options available.
Q: How is leakage prevented?
A: Dual-seal flange connections and vulcanized end sections ensure watertight performance.
Contact our water control specialists today for project-specific quotations and technical drawings. All systems include 5-year warranty on rubber components and 24-month support.
Send Inquiry to This Supplier
You May Also Like
-
Durable Rubber Weir Dam for Irrigation and Flood ControlUS$ 170 - 250MOQ: 20 Meters
-
Durable Rubber Weir Dam for Irrigation and Flood ControlUS$ 170 - 250MOQ: 20 Meters
-
Reinforced Rubber Dam for Municipal Water Conservancy EngineeringUS$ 170 - 250MOQ: 20 Meters
-
Anti-Abrasion Inflatable Rubber Dam With Long Service LifeUS$ 170 - 250MOQ: 20 Meters
-
Easy Installation Rubber Dam for Small and Medium Water ProjectsUS$ 170 - 250MOQ: 20 Meters
-
High Sealing Rubber Dam for Water Retention and DiversionUS$ 170 - 250MOQ: 20 Meters
-
Corrosion Resistant Rubber Dam for Coastal Water EngineeringUS$ 170 - 250MOQ: 20 Meters
-
Foldable Rubber Dam for Flexible Water Level ControlUS$ 170 - 250MOQ: 20 Meters
-
Rubber Dam for River Channel Improvement and Water StorageUS$ 170 - 250MOQ: 20 Meters
-
Agricultural Irrigation Specialized Inflatable Rubber DamUS$ 170 - 250MOQ: 20 Meters




