Home > Packaging & Printing > Packing Machinery > Packing Line > Malting Packing Production Line With Steeping Tank , Germinating Kilning Box

Malting Packing Production Line With Steeping Tank , Germinating Kilning Box

Malting Packing Production Line With Steeping Tank , Germinating Kilning Box photo-1
Malting Packing Production Line With Steeping Tank , Germinating Kilning Box photo-2
Malting Packing Production Line With Steeping Tank , Germinating Kilning Box photo-3
Malting Packing Production Line With Steeping Tank , Germinating Kilning Box photo-4
Malting Packing Production Line With Steeping Tank , Germinating Kilning Box photo-5
Negotiable MOQ: 1 Set (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Warranty:
1 Year
Frequency of Use:
Packing
Mode of Operation:
Packaging of Export Products
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
Delivery time depends on order quantity.
Warranty 1 Year
Frequency of Use Packing
Mode of Operation Packaging of Export Products
Certification CE, UL,ISO
Delivery Time 40-50 working days
Supply Ability 20 sets per month
Model Number: GD-ZM
Transport Package iron frame /plate
Trademark Gongda
Origin China

Voltage:220V Or 380V Or Customized

Material:SUS304

Type:Germinating And Kilning Box

Condition::New

Application::Beer Or Beverage

Automatic Grade::Automatic

Driven Type::Electric 380V 50Hz 3 Phase, According To Customer Request

Material::SUS304

Malting Packing Production Line With Steeping Tank , Germinating Kilning Box

 

Germinating And Kilning Box is our long-term production on the basis of malting equipment. It is used of advanced technology and processes, several new products designed to improve with small area, large output, reliable performance, energy saving, durable, easy maintenance, etc. It is widely suitable for malting, beer, grain processing and other major manufacturers of equipment for use.

 

Main technology specification

 

1. Production capacity: 3T/Batch;

 

2. Germination air consumption: 600m³/h

 

3. Kilning air consumption: 4800m³/h

 

4. Air cool capacity: 5334Kj/h

 

5. Air heating capacity: 301450Kj/h

 

6. Germination time: about 120 hours

 

7. Kilning time: 26-28 hours

Main technology parameter

 

1. Overall size: 7000×2300×2600mm

 

2. Weight: 980kg (excluding motor)

 

3. Power:1.1kw, speed 1400 rev / min

 

4. Rotary arm Power:4kw, speed 1400 rev / min

 

5. screw speed: 8R/min


图片14.png

Malting flow:

 

1. The barley with water pumped malting machine, which will drain the water

 

2. Spray, malting barley in one machine quickly germinate, germination process to keep the spray, so that the grain required to achieve the degree of steeping, germination while intermittently open air blower timely pass, while carbon dioxide emissions generated germination and germination is completed in about 5 days.

 

3. Germination is complete, open the fuel hot air blower, direct drying 28-36 hours out of the box in the box.

Machine installation

Machine installation:

 

Machine requires a solid and smooth cement placed on a flat ground.

Machine lubrication

 

Where a rotating or moving friction parts should be regularly inject a small amount of oil.

Machine checking

 

When the new machine factory, the gap has been adjusted to the correct position and size, except in special circumstances generally do not need the user to adjust, but should check for damage and missing parts, and then the following inspection and reinspection.

1, Machine Checking before turning

 

(1) Tightness and security guards before starting the check belt is reliable, various parts of the fasteners loose.

 

(2) Check the oil in these parts.

2, Dynamic load transfer checks

(1) View cantilever starter motor rotation direction is correct, whether the required speed.

 

(2) Carefully observe whether the channeling axis, percussion and other abnormal conditions.

.

(3) No-load operation for at least 15 minutes to check.

(4)Machine Operation

 

(1) Off gate handle, flow indicators adjusted to the appropriate location.

 

(2) Starter motor.

 

(3) Pump the soaked barley to the malt box .

 

(4) After the end of each day, you should remove the slag machine memory, the machine body and the surrounding clean.

(5) Precautions

 

(1) Remember first boot backward feed.

 

(2) Prevent nails, of metal, hard rock mixed with feed.


Product Tags: keg washer filler , Malting Packing Production Line , packaging production line

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Gold Verified Supplier
1Yr
Verified Business License
Business Type
Manufacturer
Product Certifications
ISO9001
Port of Shipment
Qingdao
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe, Central America, Northern Europe, Southern Europe, South Asia, Domestic Market