Home > Electrical & Electronics > Power Transmission & Transformer > Transformer > First-class Qualification to Undertake Decoration Test Equipment and Instrument Selection

First-class Qualification to Undertake Decoration Test Equipment and Instrument Selection

First-class Qualification to Undertake Decoration Test Equipment and Instrument Selection photo-1
Negotiable MOQ: 1 Piece (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Brand Name:
gdmk
Place of Origin:
China
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
Delivery time depends on order quantity.
Brand Name gdmk
Place of Origin China

The National Energy Administration has made corresponding adjustments to the power test-qualified equipment. The test-qualified equipment in each province is the same. At the same time, some equipment that is not commonly used by power companies in actual work is omitted. Get one

Class-level installation (repair, test) permits can be used to install, repair or test power facilities with voltage levels below 10 kV. Need to understand the installation, repair, and test power facility license application materials and filling rules

Fan, you can click "Declaration Specification" to browse.

— Requirements for qualifications —


 


Those who have obtained the first-level test-based installation (repair, test) power facility permits can engage in testing activities for power facilities of all voltage levels. Applicants should meet the following conditions:

        1. Possess legal personality and perfect organizational structure;

           2. Registered capital and net assets above 48 million yuan

           3. More than 2 consecutive years of experience in testing activities for lines and substation facilities above 330 kV or more than 3 consecutive years of experience in testing activities for lines and substation facilities above 220 kV

           4. The person in charge of technology and the person in charge of safety has more than 8 years of experience in power facility test management, and possesses senior technical qualifications in power-related majors;

           5. More than 50 professional technical and economic management personnel, including more than 35 professional engineering and technical personnel related to electric power;

           6. There are more than 35 electricians holding a network operation permit, including more than 10 high-voltage electricians and more than 15 special electricians;

           7. Complete and effective safety production organizations and systems, carry out safety training in accordance with the law, and have more than 5 full-time safety supervisors

           8. The total area of fixed business premises is more than 6000 square meters, various professional laboratories and test sites and equipment for testing power facilities with voltage levels above 330 kV

           9. A sound technical file management system


Product Tags: Test equipment , First-level test equipment

Send Inquiry to This Supplier

* Message
0/5000

Want the best price? Post an RFQ now!
Verified Business License
Business Type
Manufacturer
Year Established
2014
Main Markets
Southeast Asia

Recommended Categories

Explore top categories and find suppliers for your specific needs