Negotiable MOQ: 1 Set (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Brand Name:
Place of Origin:
China
Model Number:
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
7 days
Place of Origin China
Model No.:HZ-03
Product Origin:China
Brand Name:
Price Terms:
Payment Terms:
Certification:
Description:Jack-up Working Over Platform for Working Depht 25m Introduction This platform is a steel non-propelled cantilevered three-leg self-elevating working over platform. Flat shape of the main hull is like triangle. Equipped with columnar legs, an electric rack and pinion jacking system and a helideck. This platform is suit for working over oil and water wells which are in argillo-arenaceous submarine offshore area or the similar offshore area. Principal Parameters 1: Total Length x Total Width: 63.3m x 36.6m; 2: Hull: Length x Width x Depth: 43m x 36m x 4.5m; 3: Leg: length x Diameter: 60m x φ3.0m; 4: Cantilever (Length x Width x Depth): 24m x 0.7m x 4m; 5: Derrick Movement: Transversely±3.5m; Longitudinally±10m; 6: Working Over Capacity: 5500m(27/8in); 5500m(27/8inDP); Electric Workover Rig: 7: Lifting Capacity: 2 x 16t x 25m 8: Jacking Capacity: 1200t x 3; 9: Working Depth: 4.5m~25m; 10: High Loading Draft: <3.5m; 11: Operating Environmental Temperature: -10oC ~ +40oC; 12: Fixed Number of Persons: 90; 13: Self-sustaining Capacity: 20; 14: Service Life-span: 20;

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Year Established
2004
Total Employees
101 - 200 People
Main Markets
North America, South America, Eastern Europe