Home > Construction & Decoration > Toilet & Accessories > Toilet > Auto Climbing Hydraulic Formwork Bracket System With Hydraulic Pump / Oil Cylinder

Auto Climbing Hydraulic Formwork Bracket System With Hydraulic Pump / Oil Cylinder

Auto Climbing Hydraulic Formwork Bracket System With Hydraulic Pump / Oil Cylinder photo-1
Negotiable MOQ: 1 Piece (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Brand Name:
Yunhai
Place of Origin:
China
Model Number:
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
7 days
Brand Name Yunhai
Place of Origin China
Delivery Time:30days
Certification:CE,ISO,FCC

Auto Climbing Hydraulic Formwork Bracket System with hydraulic pump / oil cylinder

Hydraulic climbing system is a perfect formwork system for the high rise tower, viaduct and across-sea bridge.

Induction

The hydraulic pump and the oil cylinder are the main drive for the climbing system. Drove by the hydraulic cylinder, the rail and the bracket can move upward separately and then the whole system climbs up wholly, through this alternation of the rail and the bracket accreting on the wall, they lift each other along the wall floor by floor, The climbing system is very easy to operate as there is no other lifting machine needed. And this is the ideal formwork system especially for high rise buildings.

Advantages

The hydraulic climbing system includes: climbing system, bracket system, formwork and handle platform.

With a good stability, the Hydraulic climbing formwork can climb up wholly or separately.

Easy and quick operation; high safety; work and material saving.

High loading capacity allows more materials packed on the working platform(as per designed).

Climbing fast can save you a lot of time.

We provide all operating platforms which save your work and material.

Application

Hydraulic climbing system is a perfect form system for the high rise tower, viaduct and across- sea bridge, etc..

Climbing Process

A: Place concrete, when the strength meets the design requirement, then remove the formwork;

B: Install the anchor load-bearing equipment, lift the rail by the hydraulic equipment;

C: Remove the under anchor load-bearing equipment for next time using, lift the bracket by the hydraulic equipment;

D: Tie up the rebar sand install the anchor;

E: Move the formwork, connect the high tension split tie-rod;

F: Move the formwork, connect the tensile split bolt.

Send Inquiry to This Supplier

Message
0/5000
Want the best price? Post an RFQ now!
Business Type
Trading Company
Total Employees
101 - 200 People
Main Markets
North America, South America, Eastern Europe
Location
Zibo, Shandong, China

Recommended Categories

Explore top categories and find suppliers for your specific needs