Home > Construction & Decoration > Shower Room & Shower Enclosure > Shower Base > GJ190 Climbing Peri Formwork for High Building / Vertical Wall / Construction of Projects

GJ190 Climbing Peri Formwork for High Building / Vertical Wall / Construction of Projects

GJ190 Climbing Peri Formwork for High Building / Vertical Wall / Construction of Projects photo-1
Negotiable MOQ: 1 Unit (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Brand Name:
Yunhai
Place of Origin:
China
Model Number:
GJ-190
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
7 days
Brand Name Yunhai
Place of Origin China
Model Number GJ-190
Delivery Time:under negotiation
Certification:CE,ISO,FCC

GJ190 Climbing peri formwork for high building / vertical wall / construction of projects

1. GJ190 Climbing peri formwork
2. suitable for dam, high building (100 meters high)
3. can stick to the concrete tight.

Product Name:Climbing Formwork

Brief Introduction:


Climbing bracket GJ190 is mainly used as operating platform during construction. It can be used in the vertical wall and arced wall. The bracket hangs on the anchor system which is the supporting system during construction. It’s easy to assemble and disassemble, and the construction is easy , rapid and economical.
The folding climbing bracket is easy to assemble and disassemble, and concvenient for storage, transportation and reusing.
The system can also be used as climbing formwork in the concrete pouring of vertical or arced wall. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, so additional reinforcement is not needed. The construction is easy, rapid and safe.

The Characteristics


1. The loads of bracket, formwork as well as other loads during construction are completely supported by the anchor system. There is no need of scaffolding. It’s suitable for construction of projects in high altitude.
2 .The climbing bracket could be folded , and It is convenient to assemble, save and reuse.
3 .The formwork can lean forward or backward by adjusting the pull-push prop, and it can reach an inclination of 18 degrees at most.
4 .All connectors are on a high level of standardization and universality.
5. All components are connected in an assembling way, which is convenient, flexible and reliable.
6 .Long and short pull-push props work together to adjust the formwork in veritcal direction.
7. It can be applied for supporting arced formwork or panel formwork, on a case-by-case basis according to the design.

Two kinds of Installation Type

for conical(bridge) pier                                                                                  for cylindrical (bridge) pier

1 formwork panel H=4000mm m2
2 suspending scaffold   set
3 Diagonal bracing   set
4 threaded rod D15 m2
5 Flynt D15 Pc
6 Shim block D20 Pc
7 Shaft Platform Beam 2.1-2.7m set
8 Anchor cone (Climing cone) M30/D20 Pc
9 bolt M30X80 Pc
10 Mold Releasing agent   Litre
11 plate,steel pipe,Guardrail    
12 Screw and nut M16X120 set
13 Expension bolt M12X60 se

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Total Employees
101 - 200 People
Main Markets
North America, South America, Eastern Europe
Location
Zibo, Shandong, China

Recommended Categories

Explore top categories and find suppliers for your specific needs