Home > Industrial Equipment & Components > Environment Protection Device > Waste Treatment Equipment > 304 Polished ERW Tube Stainless Steel Seamless Pipes for Heating Pipe

304 Polished ERW Tube Stainless Steel Seamless Pipes for Heating Pipe

304 Polished ERW Tube Stainless Steel Seamless Pipes for Heating Pipe photo-1
Negotiable MOQ: 1 Ton (Price negotiable depending on order volume and customization)
Key Specifications
Get Latest Price
Brand Name:
HTKD
Place of Origin:
China
Model Number:
Payment & Shipping
Payment Methods:
Port of Shipment:
China
Delivery Detail:
7 days
Brand Name HTKD
Place of Origin China
Delivery Time:7-20days

Product Name:

stainless steel seamless pipe

1)Size: 19mm-2200mm 
 


2)Standards: ASTM, DIN, JIS, G3463.... 
 


3)Schedules: 0.5mm-30mm

FEATURES

Process:                     

Argon Arc Welding

Standards:                     

ASTM A312,    ASTM A213,    ASTM A269,    DIN 2462,    JIS G3463

Schedules:                  

0.5mm-30mm

Material:                      

TP304,    TP304L,    TP316L,    TP321,    TP317L,    TP310S,    TP347H

Type:                                       

Seamless

Steel Grade:                            

300 Series

Certification:                             

ISO

Welding Line Type:                  

ERW

Thickness:                               

1mm-60mm

Outer Diameter:                        

8mm-830mm

Process:                                 

Argon Arc Welding

Minimum Order Quantity:          

1 Metric Ton/Metric Tons

Port:                                        

ANY CHINESE PORT

Delivery Time:                          

15-20 DAYS AFTER RECEIVING THE ADVANCE4

Payment Terms:                     

L/C,   T/T

Supply Ability:                        

800 Metric Ton/Metric Tons per Day

Usage:

Line Pipe,   Casing And Tubing,   Fluid Pipe,   Water
Delievery,   Heating Pipe,   Power Pipe,   
Structure Pipe,   Scaffold,   Piling Pipe

Manufacture Processes:

aw material Test→Uncoiling→Strip leveling →End Cutting→End Shearing and Welding→Accumlator→Forming→Telepathy Welding→Seam Heat Treatment →Air/Water Cooling→Body/Seam UT→Sizing Straightening→Cutting→Visual and Dimension Inspection→Hydraulic Test→End Beveling→Flatten Test→Seam/End UT→Length-Measuring and Weighing→Coating-Marking→Storage

Ends Processing:

Bevelled or Plain End

Surface Process:

1 Oiled
2 Galvanized
3 3PE Anti-corruption coated 
4 According to the sustomers' requiremen

Test Equipment

Raw Material Test:

Tensile Test ,   Yeild Strength,   Elogation,   Impact Test,    
ChemicalAnalysis,   Hardness Test,   Charpy 
Impact Test,   Metallographic Examination

Final Product Test:

Hydraulic Test,    On-line and off-line Ultrasonic Test,   Tensile Test ,   Yeild Strength,   Elogation,  
 Hardness Test,   Charpy Impact ,   Flattening Test
Chemical Analysis,   Metallographic Examination

Package:

1 Naked
2 Both ends with a plastic cap ,   then put the pipe into a bundle 
covered by plastic cloth accroding to the size of the pipe with steel belt tied

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Trading Company
Total Employees
101 - 200 People
Main Markets
North America, South America, Eastern Europe
Location
Jining, Shandong, China

Recommended Categories

Explore top categories and find suppliers for your specific needs