Home > Manufacturing & Processing Machinery > Plastic Machinery > Foam Machinery > Equipment for the Production of the Floral Foam

Equipment for the Production of the Floral Foam

Equipment for the Production of the Floral Foam photo-1
Equipment for the Production of the Floral Foam photo-2
US$ 36,000 - 120,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Condition:
New
Product Type:
Other, Other, Floral foam ,floral mud
Place of Origin:
Shandong, China
Payment & Shipping
Payment Methods:
Port of Shipment:
qingdao
Delivery Detail:
Delivery time depends on order quantity.
Condition New
Product Type Other, Other, Floral foam ,floral mud
Place of Origin Shandong, China
Brand Name YD
Model Number YD-FY
Weight 50g,after sbsorption is 1.5kg
Certification CE
Warranty 1 year
After-sales Service Provided Engineers available to service machinery overseas

equipment for the production of the floral foamequipment for the production of the floral foam

    shape:                        brick
    size:                              80*110*230 mm
    color:                           green
    PH value:                  about 6.8-7
    water absorbtion:               about 20-60s
    warter retaining time:    about 7-10 days
    dry     weight:           50g
    wet     weight:          1.5-2kg

 a. reactor: low speed mixing, electrical heating, automatic temperature control
 b. mixer: high speed mixing, with mixing tank
 c. foaming mould: water cycle, electrical heating, automatic temperature control
 d. foam cutting machine: vertical cuutingmachine and horizontal pushing machineequipment for the production of the floral foamequipment for the production of the floral foamequipment for the production of the floral foamequipment for the production of the floral foamequipment for the production of the floral foamequipment for the production of the floral foamequipment for the production of the floral foamequipment for the production of the floral foam

About Delivery time

Q-----What’s the delivery term for making business with us?
A-----Usually we send tne shipments in FOB term.However, the terms of CIF are acceptable which depend on the preference of clients.

About Lead Time

Q------What’s the lead time after placing thr order?
A------Usually it takes about 25~30 days after we received your confirmation.
However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.

About Payment Term

Q------What’s the Payment Term?
A------By T/T in Advance, or Irrevocable L/C as Sight.

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2005
Factory Size
5,000-10,000 square meters
Total Employees
11 - 50 People