Gold Panning Dredger

Gold Panning Dredger photo-1
US$ 100,000 - 120,000 MOQ: 1 Set
Key Specifications
Get Latest Price
Place of Origin:
Shandong, China
Brand Name:
YS Dredger
Model Number:
gold panning dredger
Payment & Shipping
Payment Methods:
Port of Shipment:
Tianjin
Delivery Detail:
Delivery time depends on order quantity.
Place of Origin Shandong, China
Brand Name YS Dredger
Model Number gold panning dredger
Condition New

Specifications

1.Simple, rapid assembly and dismantling.
2.Spare parts and floating pipe available.
3.Transportable by road, rail or sea.

Working process of Gold Paning Machine consist of Dredging System,Sieving System,Gold-Chute System,Secondary Dredging System,Conveyor and Control System.

 

Gold Gliding System. Sand material equally enter gold gliding board by water current which makes up with saltatory structure and gold carpet. Water current form saltatory flow, gold grains come to bottom of the flow, especially big gold grain.Therefore, the system can reduce the wastage, rate of recovery can reach 87%. Wash gold carpet in two times per day. Separate gold grain by small centrifuge, the purity can reach 85%

Send Inquiry to This Supplier

Message
0/5000

Want the best price? Post an RFQ now!
Business Type
Manufacturer, Trading Company
Year Established
2008
Factory Size
3,000-5,000 square meters
Total Employees
101 - 200 People