Gold Dredge for Sale With Gold Chuting System
Dredging Depth-16m,100m³/h | ||
Item |
Parameter |
Material |
Dredging Bucket |
94 pcs |
|
Hull(L×W×H ) |
31mX2mX1.14m |
Hull plate4mm,Deck-3mm anti-skidding steel plate. Keel-- 6#angle steel, 10# U-steel support per layer. |
Frame(L×W×H ) |
6.5mX1.25mX1.25m |
16#square steel and 16#U steel |
Ladder |
2152cmX110cmX85cm |
Bottom- 14# square steel Top- 14# U-steel |
Pentagon Wheel |
Dia-130cm Width-80cm |
Steel Plate- 25mm |
Trommel Screen |
Dia-130cm ,Length-160cm |
19#Round steel (Oil drilling lift stem) |
Gravel Chute |
Length-6m |
|
|
Link Plate (consolidation) |
670mmX90mmX28mm |
65# manganese, high frequency |
Bucket |
Capacity- 0.06m³/bucket |
|
Gearbox |
JZQ850*1set,JZQ500*1set,350*3sets,250*2sets |
ZIBO CHUANG YING |
Electric motor |
8y45kw,18kw*1,7.5kw*3sets 4kw*2 sets |
SHANDONG HUALI ELECTRIC LTD |
Magnetic Separator |
900mm*2200mm (3500GS) |
4KW, Seperation with water |
Gold Chute |
800mm*4500mm/set |
4.5m*4sets (Prolong according to site condition) |
Water Pump |
100m³/h |
10KW |
Cabin |
1.8m*1.5m |
Operation Board /Chair |
Power |
100kw Diesel generator |
WEICHAI,brushless generator |
Pins |
Length -13cm |
Carburization |
Small tugboat |
5000cmx2000cm |
2 pcs |
ASSEMBLE DREDGER
1)Our company will send 2-3 qualified and experienced engineers to install the dredger and train your workers to operate the dredger.Meanwhile,buyer should arrange 6-8 workers to help our workers.
2) The installation period is expected 15-20 days, the buyer should provide cranes or other necessary equipments to install the dredger.
Warranty of dredger
Will provide 12-months warranty for the quality of the diesel engines, generators, gear boxes, dredge pumps, Hydraulic system, PLC control system.
1) 12 months manufacturing warranty on all new installed component parts.
2) 12 months warranty on hull and all fabricated parts.
3) Wearing parts are not included.
( for example: Cutter tooth , suction/discharge pipe)
After-sale service
During the warranty period , We will provide free parts and on-site technical guidance . After the warranty period, We will provide free on-site technical support quickly, if the shipowner need. But if the dredger need replacement parts, the cost paid by the owner.
Send Inquiry to This Supplier
You May Also Like
-
ISO9001 Certificated Bimetal Wear Resistant Clad Plate Bucket Excavator WheelUS$ 160 - 160MOQ: 1 Piece
-
Gravity Separation 6-S Shaking TableNegotiableMOQ: 1 Set
-
All Kinds of Mining Machinery and Wide-Body Mining Trucks, Mining Dump Truck, ExcavatorNegotiableMOQ: 1 Set
-
Compact 0.8 Ton Mini Excavator With Hydraulic Quick Hitch for Multiple AttachmentsNegotiableMOQ: 1 Set
-
Track Mini Excavator for Sale 2 Ton 2.5 3 Ton 5 Ton Small Rubber China Cheap Price 0.6 Ton 0.8 Ton 1 Ton 1.5 Ton 1.7 Ton 175mmNegotiableMOQ: 1
-
Essential Vibrating Bowl Feeder/vibrating FeederUS$ 9,700 - 10,000MOQ: 1 Set
-
Drilling Fluid Cyclone DesanderNegotiableMOQ: 1 Set
-
Ceramic Particle Production Line With ISO9001:2008 CertificateUS$ 5,000 - 50,000MOQ: 1 Set
-
Hot Sell High Frequency GTS Series Drum ScreenUS$ 500 - 40,000MOQ: 1 Set
-
China New Design Vibration PlatformUS$ 500 - 6,000MOQ: 1 Set