Boiler
Main technical parameters
|
DZL2-1.0 |
DZL4-1.25 |
DZL5-1.25 |
DZL6-1.25 |
DZL10-1.25 |
||
Rated E vapor |
T/h |
2 |
4 |
5 |
6 |
10 |
|
Steam Pressure |
mPa |
1.0 |
1.25 |
1.25 |
1.25 |
1.25 |
|
Steam Temperature |
°C |
184 (Saturated) |
193 (Saturated) |
193 (Saturated) |
193 (Saturated) |
194 (Saturated) |
|
Feed-Water |
°C |
20 |
20 |
20 |
20 |
20 |
|
|
Boilers |
m2 |
69.3 |
127 |
18m2 109m2 |
188.4 |
211.07 |
|
m2 |
18.77 |
34.75 |
34.75 |
87.2 |
141.5 |
|
|
m2 |
3.43 |
6 |
6 |
9.51 |
13.2 |
|
Approved Efficiency |
% |
81.85 |
84.2 |
78 |
83.86 |
78.18 |
|
Applicable Coal |
/ |
|
|
|
|
Bituminous |
|
Overall Weight |
T |
20.3 |
29.8 |
31.8 |
29.8 |
68 |
|
Overall Dimension |
m |
5.55×2.35 |
7×2.7 |
7×2.7 |
8×3.5×3.5 |
|
|
|
|
XDZZ-VI(2) |
XD-4 |
XD-4 |
XD-6 |
XD-10 |
|
|
|
A48Y-16C |
A48Y-16C |
A48Y-16C |
A48Y-16C |
A48Y-16C |
|
....
Our Services
Pre-sale
1. Depending on customer's requirement, we insist on "making profit at lowest investment" and gives best solution as per the customer’s special demand.
2. Design the most reasonable project and maximum customers' profit.
3.Provide engineers to scene to plan work site if the customer needed.
4. Provide equipment list, design drawing, construction drawing, equipment install drawing.
During-sale
1. Depend on scene, draw design drawing , construction drawing, equipment install drawing, civil work detailed drawing for references, operating manuals, maintenance video, etc
2.Manufacturing products strictly on contract while customer constructing.
3. Production progress report each week with detailed description and photos, including raw materials tables, process and deep process record, testing data sheet, etc.
4. Testing all the equipments by witness of the customer ex-work, delivery, customer acceptance.
After-sale
1. Provide engineer to work site guiding install, debugging and commissioning.
2. Test equipment after installation, training operators for free, remind notice in operating.
3. Regularly returning visit to the customers.
4. Within warranted period, we take charge of everything if any quality problems. After the warranted period, we still focus on the plant running and services.
5. Response customer’s questions within 1 working day, give effective solutions within 3 working days, go into action with 5 working day.
That’s our promise, as we know quality and service both are important for long-term’s development and cooperation.
Contact Information
Zhengzhou Yufeng Heavy Machinery CO.,LTD
Tel: +86 371 60395600
Fax:+86 371 67681159
Website:
Address: West Section of Gongye Road,Shangjie Industry Area,Zhengzhou,Henan,China
Send Inquiry to This Supplier
You May Also Like
-
BoilerNegotiableMOQ: 2300 Sets
-
The Best Selling Products Wood Pellet Boiler Pellet Burner Wood Pellet Wood Stove PricesUS$ 5,000 - 20,000MOQ: 1 Set
-
YLR-60 Biomass Pellet BurnerUS$ 12,000 - 12,500MOQ: 1 Set
-
Wood Fired Steam BoilerUS$ 5,000 - 150,000MOQ: 1 Set
-
AAC Block Steam Heating Autoclave, Steam Autoclave Reactor, Steam Curing AutoclaveUS$ 50,000 - 100,000MOQ: 1 Set
-
CE Certificate Biomass Pellet Boiler / Biomass Burner / Biomass Boiler for SaleUS$ 2,500 - 3,000MOQ: 1 Set
-
Portable Steam Generator for Baking Used Steam Turbine Generator for SaleUS$ 480 - 700MOQ: 1 Set
-
The Best Selling Vacuum DeaeratorUS$ 999 - 5,000MOQ: 1 Set
-
High Pressure Cowper Stove Industrial BurnerUS$ 1 - 2MOQ: 1 Piece
-
New Style for Chemical ,food,feed ,agriculture Industry Indirect-heating Metal Vertical BurnerUS$ 1 - 9MOQ: 1 Set

