2016 KD Movable Library Shelving/steel Mobile Double Sided Library Shelves
2016 KD Movable library Shelving/steel mobile double sided library shelves

| Name | 2016 KD Movable library Shelving/steel mobile double sided library shelves |
| Model No. | LLC-N |
| Dimension | W900*D560*H2300mm, per customer`s requirement |
| Thickness | 0.6mm as regular widely used design. 0.5~1.0mm |
| Volume | 0.09cbm |
| Color | RAL or Pantone color per customer's requirement |
| Surface | Powder coating surface |
| Lock | Pad lock/ optional lock per customer's requirement |
| Package | 1pc/per carton. |
| Packed with standard exported 5-layer carton box. | |
| Guarantee period | 10 years warranty |
| Use area | Office,school,home,hotel,hospital,company,factory, and other commercial area |
| Structure | KD structure, DIY easy assemble ( within 10 min) |
| Function | bag and shoes files keeping, hanging clothes and so on |
| Remark | OEM&ODM are accepted; |
| Mixed order is accepted. | |
| Any color and size can be customized. | |
| Certification | Certificate of Registration ISO9001 |
| Environment Management System Certificate: ISO14001 | |
| Health Safety Management System Certificate: | |
| OHSAS 18001 | |
| Delivery Time | 25 days after receiving the deposit. |
| Delivery Port | Qingdao port |
2016 KD Movable library Shelving/steel mobile double sided library shelves




electrostatic powder spraying
production line with Switzerland
OptiGun.It finish from
Skimming-Washing-Phoasphating-Pure
water washing-Drying-Powder
coating-Baking successfuly!

Newest Design!

Environment Management System Certificate:
ISO14001:2004
Health Safety Management System Certificate:
OHSAS 18001:2007
What certification your market needs,we
supply it in here.
1,Are you a manufacturer or trading company?Can l visit your factory?
Luoyang Longli Office Furniture Com.,Ltd is a leading steel furniture manufacturer in China.
Founded in 1995,Over 80000 square meter workshop,Fully automatic electrostatic powder spaying line.More than 500 staff,ISO 9001&ISO14001 certificated,20 years manufacturing&10 years exporting expertise
Welcome to our factory for further discussion&checking.
2,What is your usual material type and its thickness range?
Cold rolled steel is our main raw material,and normal thickness of our product varies from 0.5mm to 1.2mm.
3,What is your MOQ?
Normally it would be one 20’’GP container.And order less than that is still negotiable.
4,How can l trust the quality of your products?
Quality is the life of our company.From raw material to finished products, we follow strict inspection&test process to ensure sustainable quality.
All raw materials such as cold rolled steel sheet and powder pigments from your long-term cooperated supplier will go through in-coming material test in our warehouse.
Professional QC conducts on-line inspection&checking all the time.
100% quality checking before packing.Random inspection and assemble before delivery.
5,What are your trading tearms?
1) Payment term: T/T 30% deposit after order confirmed, the balance paid against copy BL . or L/C at sight
2)Lead time : normally in 25days after deposit received .
3)Sample product : Sample can be prepared before mass production . Samples can be ready in 7 days once payment received .
4)Shipping port: Qingdao , China
5)Discounts : Discounts for multiple container load of mixed goods or bulk orders of individual products will be considered.
6)OEM/ODM:acceptable.
Certificate of Registration ISO9001
Environment Management System Certificate: ISO14001
Health Safety Management System Certificate:OHSAS 18001
Quality control:
1.Raw material: Long term cooperated supplier and strict rule for inspection
2.inspectors on production line all the time.
3.Spot inspection for finished products before loading.
Can we visit your factory?
Longli warmly welcome you!
Below flights for your reference:
1) Beijing Capital airprot – Luoyang airport:
MU5695 13:00 – 14:45 1 flight 1 day
MU5699 18:00 – 19:30 1 flight 1 day
2) Guangzhou airport – Luoyang airport:
CZ3363 7:50 a.m. – 10:05 a.m. 1 flight 1 day
3) Shanghai Hongqiao – Luoyang airport:
MU5389 7:20 a.m. – 9:10 a.m. 1 flight 1 day
MU527 19:40 – 21:20 1 flight 1 day
4) Hangzhou – Luoyang:
GJ8721 7:15 a.m. – 8:55 a.m. 1 flight 1 day
When arriving, we will go to pick you up at Luoyang airport. Hotel reservation is available.

Send Inquiry to This Supplier
You May Also Like
-
Warehouse Racking With Boltless Assembly and OSHA-Compliant Safety FeaturesNegotiableMOQ: 100 Pieces
-
Heavy Duty Storage Pallet Racking SystemsNegotiableMOQ: 1 Set
-
OEM Coating Steel/Stainless Steel Kayak Rack for Inflatable Surfing Board/kayak/canonNegotiableMOQ: 10 Sets
-
Pallet Warehouse Pallet Forklift PalletUS$ 6.8 - 15.7MOQ: 100 Pieces
-
Provide Admiralty And Shipping Related Legal Services (China (Mainland))NegotiableMOQ: 1 Piece
-
United States Logistic ServicesNegotiableMOQ: 1 Piece
-
Offer Shipping And Port Agency Services (Lebanon)NegotiableMOQ: 1 Piece
-
5 Tiers Rolling Wire Basket Storage Display Rack for SupermarketNegotiableMOQ: 100 Sets
-
HOT !!! Precision Store Shelf Supplier With 30 Years Experience in ChinaUS$ 2 - 80MOQ: 100 Sets
-
Polythlyene Coolers by RotomoldUS$ 100 - 200MOQ: 1 Set
